The Study Engineering overdue Causing Disputes in Construction Projects

碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 102 === Since civil engineering usually involves a wide scope of things, unexpected situation is usually met in the engineering process, which leads to forced engineering delay or even stop of the construction, hence, dispute usually occurs between the customer and...

Full description

Bibliographic Details
Main Authors: Chun-Kai Chung, 鐘俊凱
Other Authors: Jen-Rong Lee
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/22820466124340234658
id ndltd-TW-102NKIT5512013
record_format oai_dc
spelling ndltd-TW-102NKIT55120132016-07-08T04:23:36Z http://ndltd.ncl.edu.tw/handle/22820466124340234658 The Study Engineering overdue Causing Disputes in Construction Projects 工程逾期造成工程爭議問題之研究 Chun-Kai Chung 鐘俊凱 碩士 國立高雄第一科技大學 營建工程研究所 102 Since civil engineering usually involves a wide scope of things, unexpected situation is usually met in the engineering process, which leads to forced engineering delay or even stop of the construction, hence, dispute usually occurs between the customer and the subcontractor. Using “Data search system of Judicial Yuan”, we can acquire written judgment regarding engineering delay lawsuit, through the content of the judgment, we have obtained factors related to engineering delay and means of proof for the request of compensation of engineering delay, then through Fault Tree Analysis on the convergent minimal cut set, the main reasons causing the delay are then investigated. After summarization and analysis on the judgment collected in this study, it was found that the basis for the request of increase of the expense due to the engineering schedule delay includes article 227-2 principle of change of circumstances in civil law, article 227 the effect of incomplete performance, article 231 delay compensation-responsibility of irresistible change, article 491, the subcontracting payment, etc. If the engineering contract does not have clear schedule delay agreement, then according to article 230 of civil law, subcontract can submit a proof to prove that the engineering schedule delay is inscrutable fault and the subcontractor does not have to take the delay responsibility. Using the fault tree analysis, it can be seen that factors for engineering delay are mostly design change, climate factor, unperformed contract, incapable of delivery to the construction site, defect in construction quality, delay in construction schedule, pipeline location transfer, address change, delay from related subcontractors, protest from the local residents, etc.; among them, the design change factor has the highest probability to occur. Jen-Rong Lee 李振榮 2014 學位論文 ; thesis 133 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 102 === Since civil engineering usually involves a wide scope of things, unexpected situation is usually met in the engineering process, which leads to forced engineering delay or even stop of the construction, hence, dispute usually occurs between the customer and the subcontractor. Using “Data search system of Judicial Yuan”, we can acquire written judgment regarding engineering delay lawsuit, through the content of the judgment, we have obtained factors related to engineering delay and means of proof for the request of compensation of engineering delay, then through Fault Tree Analysis on the convergent minimal cut set, the main reasons causing the delay are then investigated. After summarization and analysis on the judgment collected in this study, it was found that the basis for the request of increase of the expense due to the engineering schedule delay includes article 227-2 principle of change of circumstances in civil law, article 227 the effect of incomplete performance, article 231 delay compensation-responsibility of irresistible change, article 491, the subcontracting payment, etc. If the engineering contract does not have clear schedule delay agreement, then according to article 230 of civil law, subcontract can submit a proof to prove that the engineering schedule delay is inscrutable fault and the subcontractor does not have to take the delay responsibility. Using the fault tree analysis, it can be seen that factors for engineering delay are mostly design change, climate factor, unperformed contract, incapable of delivery to the construction site, defect in construction quality, delay in construction schedule, pipeline location transfer, address change, delay from related subcontractors, protest from the local residents, etc.; among them, the design change factor has the highest probability to occur.
author2 Jen-Rong Lee
author_facet Jen-Rong Lee
Chun-Kai Chung
鐘俊凱
author Chun-Kai Chung
鐘俊凱
spellingShingle Chun-Kai Chung
鐘俊凱
The Study Engineering overdue Causing Disputes in Construction Projects
author_sort Chun-Kai Chung
title The Study Engineering overdue Causing Disputes in Construction Projects
title_short The Study Engineering overdue Causing Disputes in Construction Projects
title_full The Study Engineering overdue Causing Disputes in Construction Projects
title_fullStr The Study Engineering overdue Causing Disputes in Construction Projects
title_full_unstemmed The Study Engineering overdue Causing Disputes in Construction Projects
title_sort study engineering overdue causing disputes in construction projects
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/22820466124340234658
work_keys_str_mv AT chunkaichung thestudyengineeringoverduecausingdisputesinconstructionprojects
AT zhōngjùnkǎi thestudyengineeringoverduecausingdisputesinconstructionprojects
AT chunkaichung gōngchéngyúqīzàochénggōngchéngzhēngyìwèntízhīyánjiū
AT zhōngjùnkǎi gōngchéngyúqīzàochénggōngchéngzhēngyìwèntízhīyánjiū
AT chunkaichung studyengineeringoverduecausingdisputesinconstructionprojects
AT zhōngjùnkǎi studyengineeringoverduecausingdisputesinconstructionprojects
_version_ 1718341982152032256