The study the impact of utilizing remote monitoring systems to assist the traditional monitoring in the surveillance of the quality control of asphalt concrete

碩士 === 國立中央大學 === 土木工程學系在職專班 === 102 === The pavement is often damaged owing to the factors of climate, overloaded and time. In order to improve this damage, the common way of improvement is removing the surface of a pavement area. However, the contents of recycled asphalt in pavement always exce...

Full description

Bibliographic Details
Main Authors: Kuan-lun wen, 溫冠綸
Other Authors: Jyh-dong Lin
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/39651072133592123416
Description
Summary:碩士 === 國立中央大學 === 土木工程學系在職專班 === 102 === The pavement is often damaged owing to the factors of climate, overloaded and time. In order to improve this damage, the common way of improvement is removing the surface of a pavement area. However, the contents of recycled asphalt in pavement always exceed the standard of the regulations after recycling and reusing in many times, and the quality of the pavement is not only dropped off year by year, but also endangered the drivers. Therefore, recycled hot mix asphalt is forbidden using in many road constructions. In addition, owners will delegate the staff to ensure the asphalt pavement material was produced base on the contract by milling producer and the quality of the asphalt pavement material. Nevertheless, there are insufficient human resources for many places to build simultaneously. Therefore, this study was to learn more about asphalt concrete production process , the finished product storage tanks , to avoid different proportions of recycled materials or materials mixed in, mining factory dedicated professionals , doing hot material sieve analysis test in about 20 minutes after the production , as a result, the ratio will be adjusted appropriately adjusted handed to the operating room , to be stable production , take the mixture and the oil content of finished products such as sieve analysis test procedures to achieve high -quality asphalt products , whose recording equipment and remote connection systems confirm later, at the discharge port , cold hopper , control room, control panel , renewable materials conveyor , control room, construction machinery and other locations to set up the camera , and a database program designed to establish a combination of remote monitoring system. In this study, this system is not only displayed on computers, but also remote monitored by smart phones immediately. Hence, it can provide the engineers and supervisors with the progress and the quality of a construction. Finally, we performed a case study and evaluated that whether a lower human resources, improve the quality of road works better, good idea of sustainable development. Keyword:asphalt concrete, remote monitoring systems, Mill Point,The quality of road works