A Genetic Algorithm for Integrated Production and Distribution Scheduling with Earliness/Tardiness Penalty with Soft Time Windows
碩士 === 國立交通大學 === 工業工程與管理系所 === 102 === Nowadays many companies are adapting the make-to-order (MTO) business model in order to reduce their inventory and increase their net profit. The success of this model is based on finding a good balance between reducing the transportation costs and at the same...
Main Authors: | Jorge Ricardo Alania Montoya, 何飛 |
---|---|
Other Authors: | Jasmine Chang |
Format: | Others |
Language: | en_US |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/7bar5n |
Similar Items
-
Single-Machine Scheduling with Time Windows and Weighted Earliness/Tardiness Penalties
by: Chen-Li Chien, et al.
Published: (2002) -
Minimizing Total Weighted Earliness-Tardiness Penalties for the Single Machine Scheduling Problem with Common Due Window
by: Meng-yu Lin, et al. -
Minimizing Total Weighted Earliness-Tardiness Penalties for the Single Machine Scheduling Problem with Common Due Window
by: meng-yu Lin, et al. -
Application of New Approaches to Space Scheduling Problems with Early and Tardy Penalty
by: Chin-Lun Ouyang, et al.
Published: (2008) -
Minimizing Tardiness Penalty Costs in Job Shop Scheduling Under Maximum Allowable Tardiness
by: Jae-Gon Kim, et al.
Published: (2020-11-01)