The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 102 === Under the intense competition of semiconductor industry, how to improve the quality, capacity requirement, new technology development, and cost-down situation becomes the most important issues in the market. Especially, the feature of the IC design house i...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/68hdhh |
id |
ndltd-TW-102NCTU5031063 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102NCTU50310632019-05-15T21:50:57Z http://ndltd.ncl.edu.tw/handle/68hdhh The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M IC設計業外包商評選之探討-以M公司為例 Hung, Wei-Chun 洪薇淳 碩士 國立交通大學 管理學院工業工程與管理學程 102 Under the intense competition of semiconductor industry, how to improve the quality, capacity requirement, new technology development, and cost-down situation becomes the most important issues in the market. Especially, the feature of the IC design house is a fables industry, its manufacturing processes are outsourcing to subcontractors. The responsibility of product quality and market competition is controlled by subcontractor. Therefore to choose its subcontractors is the most important subject on IC design house. This study is to develop the process for choosing an appropriate subcontractor. Firstly, we define the criteria to be considered in the determination of the subcontractors of IC testing house and IC assembly house for a memory IC design house. Secondly, based on the method of Analysis Hierarchy Process (AHP) we interview a number of managers to define the weights of these criteria for company M. Finally we analysis the survey results for some manager insights. We aim to assist the IC design house to manage the subcontractors by using this method, and make those industries have objective and impartial criteria under selection. Hsu, Hsi-Mei 許錫美 2014 學位論文 ; thesis 51 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 102 === Under the intense competition of semiconductor industry, how to improve the quality, capacity requirement, new technology development, and cost-down situation becomes the most important issues in the market. Especially, the feature of the IC design house is a fables industry, its manufacturing processes are outsourcing to subcontractors. The responsibility of product quality and market competition is controlled by subcontractor. Therefore to choose its subcontractors is the most important subject on IC design house.
This study is to develop the process for choosing an appropriate subcontractor. Firstly, we define the criteria to be considered in the determination of the subcontractors of IC testing house and IC assembly house for a memory IC design house. Secondly, based on the method of Analysis Hierarchy Process (AHP) we interview a number of managers to define the weights of these criteria for company M. Finally we analysis the survey results for some manager insights. We aim to assist the IC design house to manage the subcontractors by using this method, and make those industries have objective and impartial criteria under selection.
|
author2 |
Hsu, Hsi-Mei |
author_facet |
Hsu, Hsi-Mei Hung, Wei-Chun 洪薇淳 |
author |
Hung, Wei-Chun 洪薇淳 |
spellingShingle |
Hung, Wei-Chun 洪薇淳 The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
author_sort |
Hung, Wei-Chun |
title |
The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
title_short |
The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
title_full |
The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
title_fullStr |
The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
title_full_unstemmed |
The Subcontractor Selection Criteria of IC Design House – A Case Study of Company M |
title_sort |
subcontractor selection criteria of ic design house – a case study of company m |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/68hdhh |
work_keys_str_mv |
AT hungweichun thesubcontractorselectioncriteriaoficdesignhouseacasestudyofcompanym AT hóngwēichún thesubcontractorselectioncriteriaoficdesignhouseacasestudyofcompanym AT hungweichun icshèjìyèwàibāoshāngpíngxuǎnzhītàntǎoyǐmgōngsīwèilì AT hóngwēichún icshèjìyèwàibāoshāngpíngxuǎnzhītàntǎoyǐmgōngsīwèilì AT hungweichun subcontractorselectioncriteriaoficdesignhouseacasestudyofcompanym AT hóngwēichún subcontractorselectioncriteriaoficdesignhouseacasestudyofcompanym |
_version_ |
1719119767897374720 |