The development of a real-time inventory system─Case of the electric mechanical engineering project
碩士 === 國立成功大學 === 製造資訊與系統研究所 === 102 === The electric mechanical is one important part of construction engineering. But there exist many uncertain factors in the electric mechanical engineering workshop causing inventory management is difficult. The case of this study is implementation of electric m...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/w5ddy9 |
id |
ndltd-TW-102NCKU5621008 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102NCKU56210082019-05-15T21:42:46Z http://ndltd.ncl.edu.tw/handle/w5ddy9 The development of a real-time inventory system─Case of the electric mechanical engineering project 即時性存貨系統之建構─以機電工程專案為例 Yu-JhihSu 蘇郁智 碩士 國立成功大學 製造資訊與系統研究所 102 The electric mechanical is one important part of construction engineering. But there exist many uncertain factors in the electric mechanical engineering workshop causing inventory management is difficult. The case of this study is implementation of electric mechanical engineering. The variability present during the construction process usually causes errors in material demand prediction. Material shortage which occurs must be purchased to make up for the insufficient quantity, causing budget overrun. To solve this problem, this study implements a real-time inventory system in Microsoft Excel using spreadsheets and Visual Basic for Application (VBA) modules, and these spreadsheets having the material information are shared via cloud computing service. Then, using simulation optimization to improve the material pick-up process by determining the optimal number of material pick-up rounds. According to the simulation result, if using the real-time inventory system which includes decision support function, the total cost can be reduced by approximately 11.7% and the robustness of the real-time inventory system is proved by sensitivity analysis. Taho Yang 楊大和 2014 學位論文 ; thesis 115 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 製造資訊與系統研究所 === 102 === The electric mechanical is one important part of construction engineering. But there exist many uncertain factors in the electric mechanical engineering workshop causing inventory management is difficult. The case of this study is implementation of electric mechanical engineering. The variability present during the construction process usually causes errors in material demand prediction. Material shortage which occurs must be purchased to make up for the insufficient quantity, causing budget overrun. To solve this problem, this study implements a real-time inventory system in Microsoft Excel using spreadsheets and Visual Basic for Application (VBA) modules, and these spreadsheets having the material information are shared via cloud computing service. Then, using simulation optimization to improve the material pick-up process by determining the optimal number of material pick-up rounds. According to the simulation result, if using the real-time inventory system which includes decision support function, the total cost can be reduced by approximately 11.7% and the robustness of the real-time inventory system is proved by sensitivity analysis.
|
author2 |
Taho Yang |
author_facet |
Taho Yang Yu-JhihSu 蘇郁智 |
author |
Yu-JhihSu 蘇郁智 |
spellingShingle |
Yu-JhihSu 蘇郁智 The development of a real-time inventory system─Case of the electric mechanical engineering project |
author_sort |
Yu-JhihSu |
title |
The development of a real-time inventory system─Case of the electric mechanical engineering project |
title_short |
The development of a real-time inventory system─Case of the electric mechanical engineering project |
title_full |
The development of a real-time inventory system─Case of the electric mechanical engineering project |
title_fullStr |
The development of a real-time inventory system─Case of the electric mechanical engineering project |
title_full_unstemmed |
The development of a real-time inventory system─Case of the electric mechanical engineering project |
title_sort |
development of a real-time inventory system─case of the electric mechanical engineering project |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/w5ddy9 |
work_keys_str_mv |
AT yujhihsu thedevelopmentofarealtimeinventorysystemcaseoftheelectricmechanicalengineeringproject AT sūyùzhì thedevelopmentofarealtimeinventorysystemcaseoftheelectricmechanicalengineeringproject AT yujhihsu jíshíxìngcúnhuòxìtǒngzhījiàngòuyǐjīdiàngōngchéngzhuānànwèilì AT sūyùzhì jíshíxìngcúnhuòxìtǒngzhījiàngòuyǐjīdiàngōngchéngzhuānànwèilì AT yujhihsu developmentofarealtimeinventorysystemcaseoftheelectricmechanicalengineeringproject AT sūyùzhì developmentofarealtimeinventorysystemcaseoftheelectricmechanicalengineeringproject |
_version_ |
1719119255207673856 |