Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung
碩士 === 國立成功大學 === 水利及海洋工程學系 === 102 === River restoration projects have become increasingly common, but lack of monitoring efforts led to the difficulty of obtaining the lessons of success and failure of a project. Hence, systematic post-project appraisals (PPAs) become very important in order to ob...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/9de34s |
id |
ndltd-TW-102NCKU5083087 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102NCKU50830872019-05-15T21:42:46Z http://ndltd.ncl.edu.tw/handle/9de34s Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung 河川復育成效評估之研究-以抽藤坑溪為例 NinaShaskia 沙可雅 碩士 國立成功大學 水利及海洋工程學系 102 River restoration projects have become increasingly common, but lack of monitoring efforts led to the difficulty of obtaining the lessons of success and failure of a project. Hence, systematic post-project appraisals (PPAs) become very important in order to obtain lessons learned from past projects and apply adaptive management for future similar projects. This study provides performance assessment of Chotengkeng Creek restoration project in terms of conveyance and habitat objectives. PPA was conducted and the performance assessment was provided as results from several surveys. Evaluation of in-stream habitat structure showed that 98% of all structures had given sign of damage, and indicated the project to fail in achieving habitat objectives. It is found that eventhough there were emergent of vegetation and changes in the river bed, this project seems to achieved its conveyance objective. This study suggest for future similar projects to include post project monitoring effort and consideration of geomorphic issues (e.g. sediment transport process) in project design in order to get an effective restoration project. Modification of channel and placement of in-stream structure will become unproductive in stream with high sediment yield. Hsiao-Wen Wang 王筱雯 2014 學位論文 ; thesis 76 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 水利及海洋工程學系 === 102 === River restoration projects have become increasingly common, but lack of monitoring efforts led to the difficulty of obtaining the lessons of success and failure of a project. Hence, systematic post-project appraisals (PPAs) become very important in order to obtain lessons learned from past projects and apply adaptive management for future similar projects. This study provides performance assessment of Chotengkeng Creek restoration project in terms of conveyance and habitat objectives. PPA was conducted and the performance assessment was provided as results from several surveys. Evaluation of in-stream habitat structure showed that 98% of all structures had given sign of damage, and indicated the project to fail in achieving habitat objectives. It is found that eventhough there were emergent of vegetation and changes in the river bed, this project seems to achieved its conveyance objective. This study suggest for future similar projects to include post project monitoring effort and consideration of geomorphic issues (e.g. sediment transport process) in project design in order to get an effective restoration project. Modification of channel and placement of in-stream structure will become unproductive in stream with high sediment yield.
|
author2 |
Hsiao-Wen Wang |
author_facet |
Hsiao-Wen Wang NinaShaskia 沙可雅 |
author |
NinaShaskia 沙可雅 |
spellingShingle |
NinaShaskia 沙可雅 Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
author_sort |
NinaShaskia |
title |
Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
title_short |
Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
title_full |
Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
title_fullStr |
Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
title_full_unstemmed |
Post Project Appraisals on River Restoration of Chotengkeng Creek in Taichung |
title_sort |
post project appraisals on river restoration of chotengkeng creek in taichung |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/9de34s |
work_keys_str_mv |
AT ninashaskia postprojectappraisalsonriverrestorationofchotengkengcreekintaichung AT shākěyǎ postprojectappraisalsonriverrestorationofchotengkengcreekintaichung AT ninashaskia héchuānfùyùchéngxiàopínggūzhīyánjiūyǐchōuténgkēngxīwèilì AT shākěyǎ héchuānfùyùchéngxiàopínggūzhīyánjiūyǐchōuténgkēngxīwèilì |
_version_ |
1719118195487408128 |