Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士班 === 102 === This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tilt...
Main Authors: | Chen-Yung, Lin, 林振永 |
---|---|
Other Authors: | Hung-Hui, Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/98837531012222786673 |
Similar Items
-
Policies and Strategies forTaiwan's「photovoltaic power generation」
by: Peng,Hsien-Chung, et al.
Published: (2016) -
The Study of Strategic Competitiveness forTaiwan’s Virtual Reality Industry
by: Wen-Tai Wang, et al.
Published: (2016) -
A Study of Construction of Service Indices forTaiwan Railway Administration
by: Ruei-de Li, et al.
Published: (2009) -
China’s Naval Expansions and Their Implications forTaiwan’s Security(1991-2008)
by: Teng-Yuan Cheng, et al.
Published: (2008) -
Study on the Performance of Spread Trading forTaiwan Stock Index Weekly Option
by: Chien-Chi Fang, et al.
Published: (2013)