Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section

碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士班 === 102 === This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tilt...

Full description

Bibliographic Details
Main Authors: Chen-Yung, Lin, 林振永
Other Authors: Hung-Hui, Chen
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/98837531012222786673
id ndltd-TW-102MHIT1015014
record_format oai_dc
spelling ndltd-TW-102MHIT10150142017-11-02T04:28:19Z http://ndltd.ncl.edu.tw/handle/98837531012222786673 Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section 高速鐵路竹東段支承柱子傾斜度監測之研究 Chen-Yung, Lin 林振永 碩士 明新科技大學 土木工程與環境資源管理系碩士班 102 This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tiltmeter was used to monitor the displacement of the pier and record the readings of it. By using the measured data and statistical analysis results, it is intended to discover any deterioration occurred in the pier structure due to the nearby construction. In this investigation, inclined displacements of THSR piers were statistically analyzed during the construction as compared with those of non-construction stage. It is shown that very small variation was observed on the measured data and the inclined displacements are quite smaller than the regulated limits. This findings can be used as related reference for the THSR project. Keywords: Tilt, THSR, initial value, observed value, pier, inclination Hung-Hui, Chen 陳鴻輝 2014 學位論文 ; thesis 73 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士班 === 102 === This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tiltmeter was used to monitor the displacement of the pier and record the readings of it. By using the measured data and statistical analysis results, it is intended to discover any deterioration occurred in the pier structure due to the nearby construction. In this investigation, inclined displacements of THSR piers were statistically analyzed during the construction as compared with those of non-construction stage. It is shown that very small variation was observed on the measured data and the inclined displacements are quite smaller than the regulated limits. This findings can be used as related reference for the THSR project. Keywords: Tilt, THSR, initial value, observed value, pier, inclination
author2 Hung-Hui, Chen
author_facet Hung-Hui, Chen
Chen-Yung, Lin
林振永
author Chen-Yung, Lin
林振永
spellingShingle Chen-Yung, Lin
林振永
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
author_sort Chen-Yung, Lin
title Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
title_short Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
title_full Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
title_fullStr Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
title_full_unstemmed Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
title_sort case study of pier inclined displacement fortaiwan high speed rail structure at chu-tung section
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/98837531012222786673
work_keys_str_mv AT chenyunglin casestudyofpierinclineddisplacementfortaiwanhighspeedrailstructureatchutungsection
AT línzhènyǒng casestudyofpierinclineddisplacementfortaiwanhighspeedrailstructureatchutungsection
AT chenyunglin gāosùtiělùzhúdōngduànzhīchéngzhùziqīngxiédùjiāncèzhīyánjiū
AT línzhènyǒng gāosùtiělùzhúdōngduànzhīchéngzhùziqīngxiédùjiāncèzhīyánjiū
_version_ 1718559050425171968