Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section
碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士班 === 102 === This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tilt...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/98837531012222786673 |
id |
ndltd-TW-102MHIT1015014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102MHIT10150142017-11-02T04:28:19Z http://ndltd.ncl.edu.tw/handle/98837531012222786673 Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section 高速鐵路竹東段支承柱子傾斜度監測之研究 Chen-Yung, Lin 林振永 碩士 明新科技大學 土木工程與環境資源管理系碩士班 102 This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tiltmeter was used to monitor the displacement of the pier and record the readings of it. By using the measured data and statistical analysis results, it is intended to discover any deterioration occurred in the pier structure due to the nearby construction. In this investigation, inclined displacements of THSR piers were statistically analyzed during the construction as compared with those of non-construction stage. It is shown that very small variation was observed on the measured data and the inclined displacements are quite smaller than the regulated limits. This findings can be used as related reference for the THSR project. Keywords: Tilt, THSR, initial value, observed value, pier, inclination Hung-Hui, Chen 陳鴻輝 2014 學位論文 ; thesis 73 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士班 === 102 === This Study is to analyze pier structural safety of the Taiwan High Speed Rail (THSR) structure through the inclined displacement measurements. These displacements are induced from construction vibration nearby the Chu-Tung water channel project. The Tiltmeter was used to monitor the displacement of the pier and record the readings of it. By using the measured data and statistical analysis results, it is intended to discover any deterioration occurred in the pier structure due to the nearby construction. In this investigation, inclined displacements of THSR piers were statistically analyzed during the construction as compared with those of non-construction stage. It is shown that very small variation was observed on the measured data and the inclined displacements are quite smaller than the regulated limits. This findings can be used as related reference for the THSR project.
Keywords:
Tilt, THSR, initial value, observed value, pier, inclination
|
author2 |
Hung-Hui, Chen |
author_facet |
Hung-Hui, Chen Chen-Yung, Lin 林振永 |
author |
Chen-Yung, Lin 林振永 |
spellingShingle |
Chen-Yung, Lin 林振永 Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
author_sort |
Chen-Yung, Lin |
title |
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
title_short |
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
title_full |
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
title_fullStr |
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
title_full_unstemmed |
Case Study of Pier Inclined Displacement forTaiwan High Speed Rail Structure at Chu-Tung Section |
title_sort |
case study of pier inclined displacement fortaiwan high speed rail structure at chu-tung section |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/98837531012222786673 |
work_keys_str_mv |
AT chenyunglin casestudyofpierinclineddisplacementfortaiwanhighspeedrailstructureatchutungsection AT línzhènyǒng casestudyofpierinclineddisplacementfortaiwanhighspeedrailstructureatchutungsection AT chenyunglin gāosùtiělùzhúdōngduànzhīchéngzhùziqīngxiédùjiāncèzhīyánjiū AT línzhènyǒng gāosùtiělùzhúdōngduànzhīchéngzhùziqīngxiédùjiāncèzhīyánjiū |
_version_ |
1718559050425171968 |