A Study of Management Effects on the Initial Stage of Aircraft Maintenance Outsourcing as Exemplified with Two-Model Aircraft
碩士 === 高苑科技大學 === 經營管理研究所 === 102 === Experiencing“Ching-Shih”(the first stage downsizing), “Ching-Chin” (the second stage downsizing), the processing policy “Ching-Tsui” (the third stage downsizing), and the coming policy “Yung-Ku” (the fourth stage downsizing), ,the military personnel is cutting d...
Main Authors: | Wen-Hao Chang, 張文浩 |
---|---|
Other Authors: | 王秋興 |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/uqxb5v |
Similar Items
-
Application of Knowledge Map Construction in Aircraft Maintenance Management─A Case Study of Mititary Aircraft Outsourcing Maintenance A Company
by: Chi-Ming Lee, et al.
Published: (2015) -
The Key Success Factors of Maintenance Outsourcing for the Army Aircrafts
by: Li Chien Hung, et al.
Published: (2011) -
A Study of Audit Improvement on the Outsourcing of Maintenance of Military Aircraft
by: Chun-Shen Meng, et al.
Published: (2008) -
An Reliability Analysis on Maintenance Outsourcing for Aircrafts: The Case of Landing Gear
by: Ming-Chung Hsu, et al. -
An Reliability Analysis on Maintenance Outsourcing for Aircrafts: The Case of Landing Gear
by: Ming-Chung Hsu, et al.
Published: (2009)