A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK
碩士 === 國立高雄應用科技大學 === 財富與稅務管理系碩士在職專班 === 102 === Implementing Total Productivity Maintenance (TPM) is a combination of activities that improve people, equipment, technology and management, as well as a powerful tool to enhance the capability of a plant. However, while a plant reaps the benefits...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62zx39 |
id |
ndltd-TW-102KUAS1307043 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102KUAS13070432019-05-15T21:22:54Z http://ndltd.ncl.edu.tw/handle/62zx39 A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK 全面生產保養(TPM)推動後對現場部門組織氣候與工作滿意度之探討-以台肥高雄廠為例 An-Shinn Sun 孫安信 碩士 國立高雄應用科技大學 財富與稅務管理系碩士在職專班 102 Implementing Total Productivity Maintenance (TPM) is a combination of activities that improve people, equipment, technology and management, as well as a powerful tool to enhance the capability of a plant. However, while a plant reaps the benefits from TPM, the reactions and feelings of its on-site staff cannot be overlooked.The task nature and mode of the on-site department at Taiwan Fertilizer’s Kaohsiung plant has changed since their implementation of TPM activities. Whether such changes will result in any difference in organization climate or job satisfaction is unknown. This research aims to find out through survey the impact of TPM implementations on the working atmosphere and job satisfaction as a whole, and on individual employee reactions. The result of this study will be used in the planning and implementation of TPM at Taiwan Fertilizer plant in Taichung. This study based the on-site staff at Taiwan Fertilizer Kaohsiung plant as research subject, and used the questionnaire survey as the tool. The results showed successful implementation of TPM activities enhanced management leaders to appear more convincing to the employees, promoted accountability and higher standards in the employees, as well as promoted better interpersonal relationships, boosted employees identifying with the organization and job satisfaction. Po-Sheng Ko Ming-Hung Yao 柯伯昇 姚名鴻 2014 學位論文 ; thesis 92 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄應用科技大學 === 財富與稅務管理系碩士在職專班 === 102 === Implementing Total Productivity Maintenance (TPM) is a combination of activities that improve people, equipment, technology and management, as well as a powerful tool to enhance the capability of a plant. However, while a plant reaps the benefits from TPM, the reactions and feelings of its on-site staff cannot be overlooked.The task nature and mode of the on-site department at Taiwan Fertilizer’s Kaohsiung plant has changed since their implementation of TPM activities. Whether such changes will result in any difference in organization climate or job satisfaction is unknown. This research aims to find out through survey the impact of TPM implementations on the working atmosphere and job satisfaction as a whole, and on individual employee reactions. The result of this study will be used in the planning and implementation of TPM at Taiwan Fertilizer plant in Taichung.
This study based the on-site staff at Taiwan Fertilizer Kaohsiung plant as research subject, and used the questionnaire survey as the tool. The results showed successful implementation of TPM activities enhanced management leaders to appear more convincing to the employees, promoted accountability and higher standards in the employees, as well as promoted better interpersonal relationships, boosted employees identifying with the organization and job satisfaction.
|
author2 |
Po-Sheng Ko |
author_facet |
Po-Sheng Ko An-Shinn Sun 孫安信 |
author |
An-Shinn Sun 孫安信 |
spellingShingle |
An-Shinn Sun 孫安信 A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
author_sort |
An-Shinn Sun |
title |
A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
title_short |
A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
title_full |
A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
title_fullStr |
A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
title_full_unstemmed |
A Study of Organizational Climate and Job Satisfaction in Manufacturing Department after TPM Implementation-A Case of TFCK |
title_sort |
study of organizational climate and job satisfaction in manufacturing department after tpm implementation-a case of tfck |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/62zx39 |
work_keys_str_mv |
AT anshinnsun astudyoforganizationalclimateandjobsatisfactioninmanufacturingdepartmentaftertpmimplementationacaseoftfck AT sūnānxìn astudyoforganizationalclimateandjobsatisfactioninmanufacturingdepartmentaftertpmimplementationacaseoftfck AT anshinnsun quánmiànshēngchǎnbǎoyǎngtpmtuīdònghòuduìxiànchǎngbùménzǔzhīqìhòuyǔgōngzuòmǎnyìdùzhītàntǎoyǐtáiféigāoxióngchǎngwèilì AT sūnānxìn quánmiànshēngchǎnbǎoyǎngtpmtuīdònghòuduìxiànchǎngbùménzǔzhīqìhòuyǔgōngzuòmǎnyìdùzhītàntǎoyǐtáiféigāoxióngchǎngwèilì AT anshinnsun studyoforganizationalclimateandjobsatisfactioninmanufacturingdepartmentaftertpmimplementationacaseoftfck AT sūnānxìn studyoforganizationalclimateandjobsatisfactioninmanufacturingdepartmentaftertpmimplementationacaseoftfck |
_version_ |
1719112774370459648 |