Simulation of Semiconductor Cycle Time for Forecasting Monthly Output of Each Product

碩士 === 逢甲大學 === 工業工程與系統管理學系 === 102 === Forecasting monthly output of each product is a critical task for a semiconductor wafer fabrication factory (fab). However, the manufacturing processes of a wafer fabrication factory are very complicated and the production from input to output usually takes 1-...

Full description

Bibliographic Details
Main Author: 裘正浩
Other Authors: 陳正芳
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/01411331051706460107