A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City

碩士 === 逢甲大學 === 土地管理學系 === 102 === Some pedestrian bridge was built in 1990, its equipment, construction has generated destruction, not only increase the cost of maintenance, function and use of quality also declined. Planning with the Ministry of Transportation of some counties and cities have been...

Full description

Bibliographic Details
Main Author: 陸怡婷
Other Authors: 張梅英
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/wj77h6
id ndltd-TW-102FCU05019037
record_format oai_dc
spelling ndltd-TW-102FCU050190372019-05-15T21:32:15Z http://ndltd.ncl.edu.tw/handle/wj77h6 A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City 人行天橋維護管理與改善對策之研究-以台中市為例 陸怡婷 碩士 逢甲大學 土地管理學系 102 Some pedestrian bridge was built in 1990, its equipment, construction has generated destruction, not only increase the cost of maintenance, function and use of quality also declined. Planning with the Ministry of Transportation of some counties and cities have been carried out on the existing footbridge assessment and planning. In this study, the first survey to understand the problem through the Western District of Taichung City pedestrian bridge site, then by interviews with experts, scholars and professionals to make appropriate improvements in methods and practices. Through a site survey and assessment, to identify Taichung City West skywalk three most in need of improvement. Focused interviews that can improve pedestrian bridge in accordance with their properties, with the surrounding environment, combined with local resources, to attract businesses, associations or other rewards through the game co-management and maintenance methods. 張梅英 2014 學位論文 ; thesis 95 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 土地管理學系 === 102 === Some pedestrian bridge was built in 1990, its equipment, construction has generated destruction, not only increase the cost of maintenance, function and use of quality also declined. Planning with the Ministry of Transportation of some counties and cities have been carried out on the existing footbridge assessment and planning. In this study, the first survey to understand the problem through the Western District of Taichung City pedestrian bridge site, then by interviews with experts, scholars and professionals to make appropriate improvements in methods and practices. Through a site survey and assessment, to identify Taichung City West skywalk three most in need of improvement. Focused interviews that can improve pedestrian bridge in accordance with their properties, with the surrounding environment, combined with local resources, to attract businesses, associations or other rewards through the game co-management and maintenance methods.
author2 張梅英
author_facet 張梅英
陸怡婷
author 陸怡婷
spellingShingle 陸怡婷
A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
author_sort 陸怡婷
title A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
title_short A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
title_full A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
title_fullStr A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
title_full_unstemmed A Study on the Maintenance and Improvement Measures at Pedestrian Bridge in Taichung City
title_sort study on the maintenance and improvement measures at pedestrian bridge in taichung city
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/wj77h6
work_keys_str_mv AT lùyítíng astudyonthemaintenanceandimprovementmeasuresatpedestrianbridgeintaichungcity
AT lùyítíng rénxíngtiānqiáowéihùguǎnlǐyǔgǎishànduìcèzhīyánjiūyǐtáizhōngshìwèilì
AT lùyítíng studyonthemaintenanceandimprovementmeasuresatpedestrianbridgeintaichungcity
_version_ 1719114634650189824