Integrated of traditional scheduling techniques - Enhanced Arrow Diagram Method
碩士 === 中華大學 === 營建管理學系碩士在職專班 === 102 === Scheduling in Construction Project Management is the main tool of project schedule, cost control, work continuity, communication, execution and results tracking. Traditional tools commonly used Gantt Chart and Network. The duration is calculated primarily f...
Main Authors: | Hsien-Kuan Chang, 張憲寬 |
---|---|
Other Authors: | Ching-jung Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/71363568390263173187 |
Similar Items
-
Classical Lie Algebra Weight Systems of Arrow Diagrams
by: Leung, Louis
Published: (2010) -
Classical Lie Algebra Weight Systems of Arrow Diagrams
by: Leung, Louis
Published: (2010) -
SKETRACK: Stroke-Based Recognition of Online Hand-Drawn Sketches of Arrow-Connected Diagrams and Digital Logic Circuit Diagrams
by: Oğuz Altun, et al.
Published: (2019-01-01) -
Integration of Simulation Technique And Expert System to Bus Scheduling
by: Wu,Tzung-Hsien, et al.
Published: (1994) -
Arrow Games and Topology
by: Chiung-Yu Chang, et al.
Published: (2009)