Cycle Time Reduction by Project Management- A Case Study of DRAM Company
碩士 === 長庚大學 === 管理學院碩士學位學程在職專班經營管理組 === 102
Main Authors: | Chen Fu Chen, 陳振富 |
---|---|
Other Authors: | W. Y. Lee |
Format: | Others |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/wcq48c |
Similar Items
-
Hold Cycle Time Reduction by Project Management - A Case Study in a DRAM Company
by: Hsin Hsien Wu, et al.
Published: (2016) -
To improve manufacturing cycle time by application of Operating Curve Management- A case study of DRAM company
by: Ping Yin Yang, et al.
Published: (2012) -
The Operating Performance of Taiwan DRAM Companies and the Government’s DRAM Industrial Policy Making
by: Jin-Shuang Chen, et al.
Published: (2011) -
CASE STUDY ON THE RISK MANAGEMENT OF DRAM MANUFACTURING COMPANY IN tAIWAN
by: Kuo, Ying-Yan, et al. -
The Development and Transformation of DRAM Industry:Case Study on Taiwanese Companies
by: Yang, Hsiao-Chen, et al.
Published: (2018)