Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning

碩士 === 國立中正大學 === 機械工程學系暨研究所 === 102 === This thesis proposes a novel path planning algorithm which integrates clustering strategy and parallelized LKH algorithm and is applied to the application of large-scale printed circuit board (PCB) drilling path planning problem. In the PCB produced process,...

Full description

Bibliographic Details
Main Authors: Chiu,Chien, 邱謙
Other Authors: Yau,Hong-Tzong
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/65000798337396947411
id ndltd-TW-102CCU00489080
record_format oai_dc
spelling ndltd-TW-102CCU004890802016-03-11T04:12:48Z http://ndltd.ncl.edu.tw/handle/65000798337396947411 Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning 分群策略與平行化處理技術應用於大規模PCB鑽孔路徑規劃 Chiu,Chien 邱謙 碩士 國立中正大學 機械工程學系暨研究所 102 This thesis proposes a novel path planning algorithm which integrates clustering strategy and parallelized LKH algorithm and is applied to the application of large-scale printed circuit board (PCB) drilling path planning problem. In the PCB produced process, drilling is one of the important processes. The movement distance of tool will affect the processing time. Generally, repeating pattern arrangement will be taken into consideration to save costs when planning. However, many related literatures in the past did not care this unique PCB information. In this study, the repeating pattern features is used for clustering strategy. A efficient repeating pattern finding method drives from Stringology is integrated into this paper. This method can be used to separate the repeating pattern in a efficient way. By the results of clustering strategy, using the LKH algorithm combined with multi-core processors while the path of each region in parallel computing. It can significant reduce the computation time. Finally, the beginning and end points considered in advance, the path will be linked to form a complete path. Finally, TSPLIB and practical cases are used to validate the path planning algorithm proposed by this study. Experimental results show that the savings in computation time has a very significant effect. On the path length, compared with the best path length difference with only less than 5%. Yau,Hong-Tzong 姚宏宗 2014 學位論文 ; thesis 73 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中正大學 === 機械工程學系暨研究所 === 102 === This thesis proposes a novel path planning algorithm which integrates clustering strategy and parallelized LKH algorithm and is applied to the application of large-scale printed circuit board (PCB) drilling path planning problem. In the PCB produced process, drilling is one of the important processes. The movement distance of tool will affect the processing time. Generally, repeating pattern arrangement will be taken into consideration to save costs when planning. However, many related literatures in the past did not care this unique PCB information. In this study, the repeating pattern features is used for clustering strategy. A efficient repeating pattern finding method drives from Stringology is integrated into this paper. This method can be used to separate the repeating pattern in a efficient way. By the results of clustering strategy, using the LKH algorithm combined with multi-core processors while the path of each region in parallel computing. It can significant reduce the computation time. Finally, the beginning and end points considered in advance, the path will be linked to form a complete path. Finally, TSPLIB and practical cases are used to validate the path planning algorithm proposed by this study. Experimental results show that the savings in computation time has a very significant effect. On the path length, compared with the best path length difference with only less than 5%.
author2 Yau,Hong-Tzong
author_facet Yau,Hong-Tzong
Chiu,Chien
邱謙
author Chiu,Chien
邱謙
spellingShingle Chiu,Chien
邱謙
Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
author_sort Chiu,Chien
title Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
title_short Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
title_full Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
title_fullStr Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
title_full_unstemmed Application of Clustering Strategy and Parallel Processing to the Large-Scale PCB Drilling Path Planning
title_sort application of clustering strategy and parallel processing to the large-scale pcb drilling path planning
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/65000798337396947411
work_keys_str_mv AT chiuchien applicationofclusteringstrategyandparallelprocessingtothelargescalepcbdrillingpathplanning
AT qiūqiān applicationofclusteringstrategyandparallelprocessingtothelargescalepcbdrillingpathplanning
AT chiuchien fēnqúncèlüèyǔpíngxínghuàchùlǐjìshùyīngyòngyúdàguīmópcbzuānkǒnglùjìngguīhuà
AT qiūqiān fēnqúncèlüèyǔpíngxínghuàchùlǐjìshùyīngyòngyúdàguīmópcbzuānkǒnglùjìngguīhuà
_version_ 1718202776162402304