Human-Machine Relationship Study On Production And Manpower Scheduling
碩士 === 元智大學 === 資訊管理學系 === 101 === As the researcher took over the manager job and felt complaints from staffs, most of them don’t understand why they are so busy. A manager has the responsibility to solve the problems, make everybody work happily. This research studied the equipment performance by...
Main Authors: | Chu-Wei Hsu, 徐志偉 |
---|---|
Other Authors: | Bing-Jyun Wang |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/77621488013286980441 |
Similar Items
-
A schedule simulation to evaluate machine and manpower resources for semiconductor wafer foundry.
by: Chyi-Jeng Chen, et al.
Published: (2018) -
Circadian rhythms, fatigue, and manpower scheduling
by: Pearson, Kristen A.
Published: (Dece) -
The Study on the Method about the manpower schedule on the system design
by: Sung, Li-Fu, et al.
Published: (1996) -
The Relationship between Hospital Financial Ratios and the Supply of Medical Manpower
by: Hsu Ya Lan, et al.
Published: (102) -
The Application of Computer Simulation in Solving Manpower Allocation Problem of the Equipment Maintenance Project
by: Chao-Wei Hsu, et al.