Enhancing the Project Planning Process for Middle-Scale Organizations by the QC Method - An Example of the Solar Energy Project
碩士 === 東海大學 === 資訊工程學系 === 101 === Generally the Small and Medium Enterprises implement project but frequently unsuccessfully. The main factor is lack of the integrity planning capacity, to result in that is wasting a lot of time and resources, in the meantime also losing more opportunities for...
Main Authors: | Shih-Fang Huang, 黃世芳 |
---|---|
Other Authors: | Dr. Wen-Kui Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/35p7b9 |
Similar Items
-
The Application of Project Management to IECQ QC 080000 System Implementation-As an Example of Semiconductor Company
by: Liang, Wen-Ming, et al.
Published: (2013) -
Study of QA/QC Practice in a Design/Build Project– C260 Works of Taiwan High Speed Railway Project
by: Huan-ping Liao, et al.
Published: (2004) -
Čebyšev inequalities for co-ordinated QC-convex and (s,QC)-convex
by: B. Meftah, et al.
Published: (2021-01-01) -
Studies of the Relationship on Project Planning Management, Knowledge Management, and Organization Performance: Water and Electricity Project in Taiwan as an Example
by: Chih-chen Hsien, et al.
Published: (2007) -
Applying QC STORY to Improve the Efficiency of Warehouse Operations - A Case Study of a Solar Energy Company
by: Fu, Tzu-Hao, et al.
Published: (2017)