Bridge Life Cycle Maintenance Strategy Optimization Model
碩士 === 國立臺灣科技大學 === 營建工程系 === 101 === Because Taiwan is influenced by monsoon climate and located in seismic zone, the bridges are usually damaged by natural disasters. As a result, it is likely to cause damaging bridges and have safety doubts. Therefore, how to evaluate the health of existing bridg...
Main Authors: | Cheng-hsuan Lin, 林正軒 |
---|---|
Other Authors: | Min-Yuan Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/49330514330179725333 |
Similar Items
-
Use Risk Assessment Model for Bridge Life Cycle Maintenance Strategy
by: Cheng-Ying Chen, et al.
Published: (2018) -
Group Bridges Life Cycle Maintenance Strategy Optimization Model
by: Zih-Long Hsu, et al.
Published: (2014) -
Optimal Life-Cycle Maintenance Planning of Bridges
by: Tsung-lin Hsien, et al.
Published: (2009) -
Optimization Model for Evaluation and Allocation of Life Cycle Maintenance Budget of Bridge Facilities
by: Shao-wei Chan, et al.
Published: (2006) -
Two-Stage Optimization Model for Life Cycle Maintenance Scheduling of Bridge Infrastructure
by: Shu-Shun Liu, et al.
Published: (2020-12-01)