The Political and Economical Analysis of the Incineration Policy in Taiwan - A case study of south and north incineration in Taoyuan County
碩士 === 國立臺灣大學 === 政治學研究所 === 101 === Taiwan garbage disposal development starts from landfill, incineration to the goal of zero waste at current stage. The Executive Yuan has decided to build 36 incineration factories, but only 24 factories had been brought into operation, 10 had been stopped built....
Main Authors: | Li-Lin Chen, 陳麗玲 |
---|---|
Other Authors: | 蕭全政 |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/07458785849615096804 |
Similar Items
-
The Policy Feasibility Evaluation of BOO In Public Construction -- A Case Study On Taoyuan County Incinerator
by: Wang , Yun-Tsen, et al.
Published: (2001) -
The Research on Policy Implementation of Lin-nei Incinerator in the Yunlin County
by: Kun-sen Shen, et al.
Published: (2009) -
Incineration
by: Cheng-Hu Wu, et al.
Published: (1993) -
The Study of Incineration policy in Taiwan:A Perspective of Historical Institutionalism
by: Chun-nan Chen, et al.
Published: (2009) -
The Study on Municipal Solid Wastes Incineration Policy in Taiwan
by: Kai-Chang Ho, et al.
Published: (2002)