A Study on Design – Construction Interface Related problems by System Thinking Technique

碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 101 === Based on the System Thinking technique, this research explored the root causes of the interface problems between the work of Design and Construction in construction projects. Four phases of work and their mutual relationships in terms of decision making and...

Full description

Bibliographic Details
Main Authors: Ching-Shu Lo, 羅靜淑
Other Authors: Chien-Liang Lin
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/53964501721439449172
id ndltd-TW-101NKIT5512013
record_format oai_dc
spelling ndltd-TW-101NKIT55120132017-04-16T04:34:31Z http://ndltd.ncl.edu.tw/handle/53964501721439449172 A Study on Design – Construction Interface Related problems by System Thinking Technique 以系統思考探討營建工程設計與施工之介面問題 Ching-Shu Lo 羅靜淑 碩士 國立高雄第一科技大學 營建工程研究所 101 Based on the System Thinking technique, this research explored the root causes of the interface problems between the work of Design and Construction in construction projects. Four phases of work and their mutual relationships in terms of decision making and interactions are analyzed. The four phases of work are (1) the owner’s design and management competence, (2) the owner’s planned and expected project duration, (3) the owner’s financial plan, (4) the design firm’s designing competence. Methodology of this research includes literature review, data collection, questionnaire, interviews, and relative importance index method (RII), as well as system thinking. Finally, the identified causes of interface problems are (1) designers are unfamiliar with the construction process, (2) designers are lack of experience and knowledge, (3) information and parameters important for the design work are insufficient and inaccurate, (4) the owner’s change order, and (5) the traditional lowest bid procurement system. The above findings are further analyzed by the system thinking technique. It is found that the real but hidden causes of interface problems are the mental model of departmentalism held by all project participants. Chien-Liang Lin 林建良 2013 學位論文 ; thesis 81 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 101 === Based on the System Thinking technique, this research explored the root causes of the interface problems between the work of Design and Construction in construction projects. Four phases of work and their mutual relationships in terms of decision making and interactions are analyzed. The four phases of work are (1) the owner’s design and management competence, (2) the owner’s planned and expected project duration, (3) the owner’s financial plan, (4) the design firm’s designing competence. Methodology of this research includes literature review, data collection, questionnaire, interviews, and relative importance index method (RII), as well as system thinking. Finally, the identified causes of interface problems are (1) designers are unfamiliar with the construction process, (2) designers are lack of experience and knowledge, (3) information and parameters important for the design work are insufficient and inaccurate, (4) the owner’s change order, and (5) the traditional lowest bid procurement system. The above findings are further analyzed by the system thinking technique. It is found that the real but hidden causes of interface problems are the mental model of departmentalism held by all project participants.
author2 Chien-Liang Lin
author_facet Chien-Liang Lin
Ching-Shu Lo
羅靜淑
author Ching-Shu Lo
羅靜淑
spellingShingle Ching-Shu Lo
羅靜淑
A Study on Design – Construction Interface Related problems by System Thinking Technique
author_sort Ching-Shu Lo
title A Study on Design – Construction Interface Related problems by System Thinking Technique
title_short A Study on Design – Construction Interface Related problems by System Thinking Technique
title_full A Study on Design – Construction Interface Related problems by System Thinking Technique
title_fullStr A Study on Design – Construction Interface Related problems by System Thinking Technique
title_full_unstemmed A Study on Design – Construction Interface Related problems by System Thinking Technique
title_sort study on design – construction interface related problems by system thinking technique
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/53964501721439449172
work_keys_str_mv AT chingshulo astudyondesignconstructioninterfacerelatedproblemsbysystemthinkingtechnique
AT luójìngshū astudyondesignconstructioninterfacerelatedproblemsbysystemthinkingtechnique
AT chingshulo yǐxìtǒngsīkǎotàntǎoyíngjiàngōngchéngshèjìyǔshīgōngzhījièmiànwèntí
AT luójìngshū yǐxìtǒngsīkǎotàntǎoyíngjiàngōngchéngshèjìyǔshīgōngzhījièmiànwèntí
AT chingshulo studyondesignconstructioninterfacerelatedproblemsbysystemthinkingtechnique
AT luójìngshū studyondesignconstructioninterfacerelatedproblemsbysystemthinkingtechnique
_version_ 1718438240821706752