On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy

碩士 === 國立東華大學 === 運籌管理研究所 === 101 === For products of some industries, such as the electronic industry, the life cycles are short. There are price erosions for components and final products, and more customers request product customization. In facing these challenges, the Assemble-To-Order (ATO)...

Full description

Bibliographic Details
Main Authors: Meng-Shiuan Tsai, 蔡孟軒
Other Authors: Yat-Wah Wan
Format: Others
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/32587451454570835394
id ndltd-TW-101NDHU5682006
record_format oai_dc
spelling ndltd-TW-101NDHU56820062017-02-26T04:27:30Z http://ndltd.ncl.edu.tw/handle/32587451454570835394 On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy 在雙產品、雙零組件組裝式生產系統中以個別訂貨或價格優先訂貨之零組件備料與配置問題 Meng-Shiuan Tsai 蔡孟軒 碩士 國立東華大學 運籌管理研究所 101 For products of some industries, such as the electronic industry, the life cycles are short. There are price erosions for components and final products, and more customers request product customization. In facing these challenges, the Assemble-To-Order (ATO) system has advantages over the traditional Make-To-Order (MTO) system. An MTO system stores final products while an ATO system stores components. In the above situation, how the contract manufacturer prestocks components with different lead times for final product assembling is an important issue. Furthermore, many contract manufacturers need to assemble different products with common components. Therefore, they also need to consider how to allocate common components to different products. We extend the multi-component, single-product ATO system in Hsu et al. (2006) to a two-component, two-product ATO system. We apply two different ordering and allocation policies for ordering and allocating the components based on the optimal procurement structure they construct. We set two problem types: one is the same-component-set problem, which the products are all assembled by the same component set. The only difference is the prices of products are different. The other is the different-component-set problem, which the products are assembled by different component sets with the same common component. We study how contract manufacturers prestock the components of various lead times under the different ordering and allocation policies. We use simulation to perform sensitive analysis. We discuss the effect of input parameters on the stock level and allocation decisions of contract manufacturers. Yat-Wah Wan 溫日華 2013 學位論文 ; thesis 92
collection NDLTD
format Others
sources NDLTD
description 碩士 === 國立東華大學 === 運籌管理研究所 === 101 === For products of some industries, such as the electronic industry, the life cycles are short. There are price erosions for components and final products, and more customers request product customization. In facing these challenges, the Assemble-To-Order (ATO) system has advantages over the traditional Make-To-Order (MTO) system. An MTO system stores final products while an ATO system stores components. In the above situation, how the contract manufacturer prestocks components with different lead times for final product assembling is an important issue. Furthermore, many contract manufacturers need to assemble different products with common components. Therefore, they also need to consider how to allocate common components to different products. We extend the multi-component, single-product ATO system in Hsu et al. (2006) to a two-component, two-product ATO system. We apply two different ordering and allocation policies for ordering and allocating the components based on the optimal procurement structure they construct. We set two problem types: one is the same-component-set problem, which the products are all assembled by the same component set. The only difference is the prices of products are different. The other is the different-component-set problem, which the products are assembled by different component sets with the same common component. We study how contract manufacturers prestock the components of various lead times under the different ordering and allocation policies. We use simulation to perform sensitive analysis. We discuss the effect of input parameters on the stock level and allocation decisions of contract manufacturers.
author2 Yat-Wah Wan
author_facet Yat-Wah Wan
Meng-Shiuan Tsai
蔡孟軒
author Meng-Shiuan Tsai
蔡孟軒
spellingShingle Meng-Shiuan Tsai
蔡孟軒
On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
author_sort Meng-Shiuan Tsai
title On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
title_short On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
title_full On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
title_fullStr On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
title_full_unstemmed On Component Stocking and Allocation for a Two-Component, Two-Product Assemble-To-Order System under the Separation and the Price-Based Priority Policy
title_sort on component stocking and allocation for a two-component, two-product assemble-to-order system under the separation and the price-based priority policy
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/32587451454570835394
work_keys_str_mv AT mengshiuantsai oncomponentstockingandallocationforatwocomponenttwoproductassembletoordersystemundertheseparationandthepricebasedprioritypolicy
AT càimèngxuān oncomponentstockingandallocationforatwocomponenttwoproductassembletoordersystemundertheseparationandthepricebasedprioritypolicy
AT mengshiuantsai zàishuāngchǎnpǐnshuānglíngzǔjiànzǔzhuāngshìshēngchǎnxìtǒngzhōngyǐgèbiédìnghuòhuòjiàgéyōuxiāndìnghuòzhīlíngzǔjiànbèiliàoyǔpèizhìwèntí
AT càimèngxuān zàishuāngchǎnpǐnshuānglíngzǔjiànzǔzhuāngshìshēngchǎnxìtǒngzhōngyǐgèbiédìnghuòhuòjiàgéyōuxiāndìnghuòzhīlíngzǔjiànbèiliàoyǔpèizhìwèntí
_version_ 1718416622236991488