The Study of Establishing Screening Criteria and Procedures of the Self-Provided Power Equipment Grounding System for Users of 69kV and above
碩士 === 國立彰化師範大學 === 電機工程學系 === 101 === Abstract The primary purpose of the grounding system is to protect the safety of the power equipment and the employees and to enhance the quality and reliability of electricity supplied from the power system. When designing the grounding system, safety is of th...
Main Author: | 田盛民 |
---|---|
Other Authors: | 楊文然 |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/54003163236823516037 |
Similar Items
-
Analysis of the Touching Ground Transient in the 69kV Transmission System
by: LIN, MING JONG, et al.
Published: (2010) -
Lighting Simulation and Analysis for 69kV Transmission Line with Coupling Ground Wire
by: Wu-Chang Chen, et al.
Published: (2009) -
Simulation and Test on The Ground-Electrodes High-Frequency Characteristics of 69kV Transmission Tower
by: Feng-Fan Wu, et al.
Published: (2012) -
Study on Surge Impedance Measurement Techniques for Ground Electrodes of 69kV Transmission Tower
by: Yi-Kai Wang, et al.
Published: (2014) -
Establishment and Applications of Real Time Contingency Analysis Information Platform for 69kV Transmission Network
by: Chen-Hong Soong, et al.
Published: (2010)