Parametric Model for Construction Overhead
碩士 === 國立中央大學 === 營建管理研究所 === 101 === In Taiwan, owner prepares budget for construction overhead by a fixed percentage fee, most of them in the scale of 5% of the contract value. This fee does not count in accord to duration, site, or construction sophistication of the project configuration. By inte...
Main Authors: | Yi-Hsuan Wen, 温亦瑄 |
---|---|
Other Authors: | Ting-Ya Hsieh |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/36098187464357283058 |
Similar Items
-
Baby Stroller knob overhead construction analysis
by: Yu-Che Hsieh, et al.
Published: (2014) -
Quantifying the impact of change to construction project overhead
by: KANG HIS CHUAN, et al.
Published: (2009) -
Simulation of Electromagnetic Coupling on Pipelines close to Overhead Transmission Lines: A Parametric Study
by: A. H. Al-Badi, et al.
Published: (2005-12-01) -
A Comparative Parametric Analysis of the Ground Fault Current Distribution on Overhead Transmission Lines
by: VINTAN, M.
Published: (2016-02-01) -
Evaluation of the competitiveness of construction company overhead costs
by: Ala Šiškina, et al.
Published: (2009-06-01)