Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition
碩士 === 國立成功大學 === 航空太空工程學系碩博士班 === 101 === Production scheduling by genetic algorithm (GA) under resource constraints in computer integrated manufacturing system is studied in this thesis. Production constraints on machine dispatching and the corresponding transportation time of overhead hoist tran...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/46239399482013733451 |
id |
ndltd-TW-101NCKU5295026 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-101NCKU52950262016-03-18T04:42:05Z http://ndltd.ncl.edu.tw/handle/46239399482013733451 Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition 應用基因演算法於含限制條件的自動化生產排程之研究 Chia-YuLin 林家右 碩士 國立成功大學 航空太空工程學系碩博士班 101 Production scheduling by genetic algorithm (GA) under resource constraints in computer integrated manufacturing system is studied in this thesis. Production constraints on machine dispatching and the corresponding transportation time of overhead hoist transporter (OHT) for mixed production with prescribed output sequence are considered. Numerical results show that machine dispatching predicted by GA can obtain shorter makespan and smaller discrepancy between the prescribed and actual output. The transportation time of OHT corresponding to every dispatched machine is considered for practical scheduling solution, and the result is validated by simulation, where, without the aid of this work, production scheduling can be tedious and often fruitless. Shih-Ming Yang 楊世銘 2013 學位論文 ; thesis 52 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 航空太空工程學系碩博士班 === 101 === Production scheduling by genetic algorithm (GA) under resource constraints in computer integrated manufacturing system is studied in this thesis. Production constraints on machine dispatching and the corresponding transportation time of overhead hoist transporter (OHT) for mixed production with prescribed output sequence are considered. Numerical results show that machine dispatching predicted by GA can obtain shorter makespan and smaller discrepancy between the prescribed and actual output. The transportation time of OHT corresponding to every dispatched machine is considered for practical scheduling solution, and the result is validated by simulation, where, without the aid of this work, production scheduling can be tedious and often fruitless.
|
author2 |
Shih-Ming Yang |
author_facet |
Shih-Ming Yang Chia-YuLin 林家右 |
author |
Chia-YuLin 林家右 |
spellingShingle |
Chia-YuLin 林家右 Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
author_sort |
Chia-YuLin |
title |
Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
title_short |
Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
title_full |
Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
title_fullStr |
Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
title_full_unstemmed |
Application of Genetic Algorithm to Production Scheduling Subject to Constraint Condition |
title_sort |
application of genetic algorithm to production scheduling subject to constraint condition |
publishDate |
2013 |
url |
http://ndltd.ncl.edu.tw/handle/46239399482013733451 |
work_keys_str_mv |
AT chiayulin applicationofgeneticalgorithmtoproductionschedulingsubjecttoconstraintcondition AT línjiāyòu applicationofgeneticalgorithmtoproductionschedulingsubjecttoconstraintcondition AT chiayulin yīngyòngjīyīnyǎnsuànfǎyúhánxiànzhìtiáojiàndezìdònghuàshēngchǎnpáichéngzhīyánjiū AT línjiāyòu yīngyòngjīyīnyǎnsuànfǎyúhánxiànzhìtiáojiàndezìdònghuàshēngchǎnpáichéngzhīyánjiū |
_version_ |
1718207308273549312 |