Removable Study for Steel Deck

碩士 === 國立成功大學 === 建築學系碩博士班 === 101 === Most floor system of high rise steel building has been constructed by steel deck forms. Usually steel deck is not one part of structural component for the buildings, it should be removed after pouring concrete. On the contrary, the steel deck has not been tak...

Full description

Bibliographic Details
Main Authors: Yu-ChiHuang, 黃昱齊
Other Authors: Chwen-Sen Chen
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/10613986884744610732
id ndltd-TW-101NCKU5222235
record_format oai_dc
spelling ndltd-TW-101NCKU52222352015-10-13T22:51:45Z http://ndltd.ncl.edu.tw/handle/10613986884744610732 Removable Study for Steel Deck 鋼承鈑拆卸之可行性研究 Yu-ChiHuang 黃昱齊 碩士 國立成功大學 建築學系碩博士班 101 Most floor system of high rise steel building has been constructed by steel deck forms. Usually steel deck is not one part of structural component for the buildings, it should be removed after pouring concrete. On the contrary, the steel deck has not been taken off due to which is installed right on the steel beam at both ends for a covering length of 5 cm. This paper has studied how to construct a removal steel deck forming after concrete pouring, the detail of forming connection and cost analysis are also studied. The conclusion presents removal forming system of steel deck is quite feasible. Chwen-Sen Chen Chwen-Sen Chen 陳純森 張嘉祥 2013 學位論文 ; thesis 108 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 建築學系碩博士班 === 101 === Most floor system of high rise steel building has been constructed by steel deck forms. Usually steel deck is not one part of structural component for the buildings, it should be removed after pouring concrete. On the contrary, the steel deck has not been taken off due to which is installed right on the steel beam at both ends for a covering length of 5 cm. This paper has studied how to construct a removal steel deck forming after concrete pouring, the detail of forming connection and cost analysis are also studied. The conclusion presents removal forming system of steel deck is quite feasible.
author2 Chwen-Sen Chen
author_facet Chwen-Sen Chen
Yu-ChiHuang
黃昱齊
author Yu-ChiHuang
黃昱齊
spellingShingle Yu-ChiHuang
黃昱齊
Removable Study for Steel Deck
author_sort Yu-ChiHuang
title Removable Study for Steel Deck
title_short Removable Study for Steel Deck
title_full Removable Study for Steel Deck
title_fullStr Removable Study for Steel Deck
title_full_unstemmed Removable Study for Steel Deck
title_sort removable study for steel deck
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/10613986884744610732
work_keys_str_mv AT yuchihuang removablestudyforsteeldeck
AT huángyùqí removablestudyforsteeldeck
AT yuchihuang gāngchéngbǎnchāixièzhīkěxíngxìngyánjiū
AT huángyùqí gāngchéngbǎnchāixièzhīkěxíngxìngyánjiū
_version_ 1718081309977346048