Monitoring and Assessment of Prestress Losses of Post-Tensioning Precast Segmental Bridges Pier
碩士 === 國立成功大學 === 土木工程學系碩博士班 === 101 === Precast segmental construction method is often used in bridge construction, but it’s more common in the box girder in Taiwan. This thesis aims at studying the prestress losses of segmental pier columns in the viaduct connecting Kaohsiung Harbor and First F...
Main Authors: | YuhLin, 林郁 |
---|---|
Other Authors: | I-Kuang Fang |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/90246665558752562804 |
Similar Items
-
Monitoring and Assessment of Prestress Losses of Post-Tensioning Precast Segmental Bridge Box-Girder
by: Hung Chen, et al.
Published: (2013) -
Monitoring of Long-Term Deformation of Precast Prestressed Segmental Pier Column and Box-Girder
by: Sheng-HsuanLin, et al.
Published: (2014) -
Seismic isolation technology for prestressed segmental precast piers
by: Liu, Y., et al.
Published: (2022) -
Long-Term Deformation of Precast Prestressed ConcreteSegmental Pier Columns
by: HOU-CHEONGTANG, et al.
Published: (2015) -
Maintenance of Precast Prestressed Concrete Segmental Bridge
by: Chien-IHsien, et al.
Published: (2018)