Identifying the Reasons for Construction Delays and Examined from Litigation Cases

碩士 === 國立成功大學 === 土木工程學系碩博士班 === 101 === Construction delays often occur without knowing who should be responsible. The owner and contractor usually do not admit their mistakes, which again causes delays. Also, some problems occur in the pre-construction stage, but cause delays during construction....

Full description

Bibliographic Details
Main Authors: Chien-ShengWu, 吳建陞
Other Authors: Andrew Shing-Tao Chang
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/66266801778156346556
id ndltd-TW-101NCKU5015066
record_format oai_dc
spelling ndltd-TW-101NCKU50150662016-03-18T04:42:18Z http://ndltd.ncl.edu.tw/handle/66266801778156346556 Identifying the Reasons for Construction Delays and Examined from Litigation Cases 找出進度延誤原因並由訴訟案例檢視 Chien-ShengWu 吳建陞 碩士 國立成功大學 土木工程學系碩博士班 101 Construction delays often occur without knowing who should be responsible. The owner and contractor usually do not admit their mistakes, which again causes delays. Also, some problems occur in the pre-construction stage, but cause delays during construction. This research was to identify the reasons for construction delays, by classifying the responsibility and construction phase, to reduce or avoid construction disputes on the construction projects. First, it collected the reasons for construction delay from literature review, and interviewed construction project participants, like owners, contractors and consultants, to analyze the reasons for construction delay in Taiwan, and compared with the reasons of delay from the Public Construction Commission project management system. Then, it compared the reasons for delays with construction practice delay cases, to see if the reasons identified in this research match those in real construction projects. Finally, it analyzed 12 construction dispute cases to identify the reasons for delays and made comparisons with those identified in this research. The results from the interviews show that the most frequent delay reason is inadequate site investigation by contractors. The responsibility proportion of owners, contractors, consultants, and beyond-control reasons is 3:3:3:1. The proportion of construction delays that occur in pre-construction, early construction, and during construction is 3:3:4. The results from the project management system show that the responsibility proportion of owners, contractors and beyond-control reasons is 6:2:2. The proportion of construction delays in pre-construction and during construction is 8:2. The results from analyzing 12 litigation cases show that, the most frequent delay reason is change orders by owner, followed by utility relocation delay. The responsibility proportion of owners, contractors, consultants, and beyond-control reasons is 5:3:1:1. The proportion of construction delays in pre-construction and during construction is 4:6. Andrew Shing-Tao Chang 張行道 2013 學位論文 ; thesis 96 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 土木工程學系碩博士班 === 101 === Construction delays often occur without knowing who should be responsible. The owner and contractor usually do not admit their mistakes, which again causes delays. Also, some problems occur in the pre-construction stage, but cause delays during construction. This research was to identify the reasons for construction delays, by classifying the responsibility and construction phase, to reduce or avoid construction disputes on the construction projects. First, it collected the reasons for construction delay from literature review, and interviewed construction project participants, like owners, contractors and consultants, to analyze the reasons for construction delay in Taiwan, and compared with the reasons of delay from the Public Construction Commission project management system. Then, it compared the reasons for delays with construction practice delay cases, to see if the reasons identified in this research match those in real construction projects. Finally, it analyzed 12 construction dispute cases to identify the reasons for delays and made comparisons with those identified in this research. The results from the interviews show that the most frequent delay reason is inadequate site investigation by contractors. The responsibility proportion of owners, contractors, consultants, and beyond-control reasons is 3:3:3:1. The proportion of construction delays that occur in pre-construction, early construction, and during construction is 3:3:4. The results from the project management system show that the responsibility proportion of owners, contractors and beyond-control reasons is 6:2:2. The proportion of construction delays in pre-construction and during construction is 8:2. The results from analyzing 12 litigation cases show that, the most frequent delay reason is change orders by owner, followed by utility relocation delay. The responsibility proportion of owners, contractors, consultants, and beyond-control reasons is 5:3:1:1. The proportion of construction delays in pre-construction and during construction is 4:6.
author2 Andrew Shing-Tao Chang
author_facet Andrew Shing-Tao Chang
Chien-ShengWu
吳建陞
author Chien-ShengWu
吳建陞
spellingShingle Chien-ShengWu
吳建陞
Identifying the Reasons for Construction Delays and Examined from Litigation Cases
author_sort Chien-ShengWu
title Identifying the Reasons for Construction Delays and Examined from Litigation Cases
title_short Identifying the Reasons for Construction Delays and Examined from Litigation Cases
title_full Identifying the Reasons for Construction Delays and Examined from Litigation Cases
title_fullStr Identifying the Reasons for Construction Delays and Examined from Litigation Cases
title_full_unstemmed Identifying the Reasons for Construction Delays and Examined from Litigation Cases
title_sort identifying the reasons for construction delays and examined from litigation cases
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/66266801778156346556
work_keys_str_mv AT chienshengwu identifyingthereasonsforconstructiondelaysandexaminedfromlitigationcases
AT wújiànshēng identifyingthereasonsforconstructiondelaysandexaminedfromlitigationcases
AT chienshengwu zhǎochūjìndùyánwùyuányīnbìngyóusùsòngànlìjiǎnshì
AT wújiànshēng zhǎochūjìndùyánwùyuányīnbìngyóusùsòngànlìjiǎnshì
_version_ 1718207946876256256