A Evaluation Model for Project Management Performance
碩士 === 龍華科技大學 === 商學與管理研究所 === 101 === The study aims to create a matrix evaluation model for project management performance, X Axis of which is SPI (Schedule Performance Index) while Y Axis is CPI (Cost Performance Index), as a method to improve project achievement performance. Project achievement...
Main Authors: | Chen, Tsung-Fu, 陳琮富 |
---|---|
Other Authors: | Chen, Yun-Ho |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/8s9hgr |
Similar Items
-
The Evaluation of Service Management System on Workshop Performance
by: Chung-Tsung Chen, et al.
Published: (2009) -
The research to evaluate the performance for legal department of bank from project management framework
by: Tseng, Chien-Fu, et al.
Published: (2006) -
Development of Total Project Management Performance Index
by: Chuang, Fu-Hsiang, et al.
Published: (2011) -
Threshold Key Management and Signature Scheme Based on the Elliptic Curve Cryptosystem for Ad Hoc Networks
by: Tsung-Fu Huang, et al.
Published: (2008) -
Evaluation model of project management team performance
by: 黃可慈
Published: (2008)