Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP)
碩士 === 國立高雄應用科技大學 === 資訊管理系碩士在職專班 === 101 === Open tendering procedure generally plays a major part in public constructions procurement procedures to award the procurement by selecting the most appropriate supplier with either "the lowest-price tender" or "the most advantage tender&qu...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/95170939410739324193 |
id |
ndltd-TW-101KUAS1396010 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-101KUAS13960102017-09-06T04:21:55Z http://ndltd.ncl.edu.tw/handle/95170939410739324193 Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) 應用層級分析法(AHP)建立政府採購評選模式 Hung-lung Liao 廖鴻隆 碩士 國立高雄應用科技大學 資訊管理系碩士在職專班 101 Open tendering procedure generally plays a major part in public constructions procurement procedures to award the procurement by selecting the most appropriate supplier with either "the lowest-price tender" or "the most advantage tender". Awarding the procurement based on the principle of the lowest-price ender usually execute the inspection of low-price and low-quality. The consequence of this rule of tender-awarding might cause the continuously disturbing of maintenance to the entity, or the controversy of contract performing during the stage of inspection and acceptance. Awarding the procurement based on the principle of the most advantage can solve the problem of low-quality construction caused by the lowest-price tender orientation, however, the formulation of selecting component and selecting weight to synthesize the integral competence of suppliers to ensure them to contract it. This research will adopt the analytic hierarchy process to constitute its selecting element, and proceed with the questionnaire to build the selecting items and weights to assist the government in the reference basis of selecting suppliers for procurement projects. Shih-wen Chien 簡世文 2013 學位論文 ; thesis 58 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄應用科技大學 === 資訊管理系碩士在職專班 === 101 === Open tendering procedure generally plays a major part in public constructions procurement procedures to award the procurement by selecting the most appropriate supplier with either "the lowest-price tender" or "the most advantage tender". Awarding the procurement based on the principle of the lowest-price ender usually execute the inspection of low-price and low-quality. The consequence of this rule of tender-awarding might cause the continuously disturbing of maintenance to the entity, or the controversy of contract performing during the stage of inspection and acceptance. Awarding the procurement based on the principle of the most advantage can solve the problem of low-quality construction caused by the lowest-price tender orientation, however, the formulation of selecting component and selecting weight to synthesize the integral competence of suppliers to ensure them to contract it. This research will adopt the analytic hierarchy process to constitute its selecting element, and proceed with the questionnaire to build the selecting items and weights to assist the government in the reference basis of selecting suppliers for procurement projects.
|
author2 |
Shih-wen Chien |
author_facet |
Shih-wen Chien Hung-lung Liao 廖鴻隆 |
author |
Hung-lung Liao 廖鴻隆 |
spellingShingle |
Hung-lung Liao 廖鴻隆 Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
author_sort |
Hung-lung Liao |
title |
Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
title_short |
Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
title_full |
Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
title_fullStr |
Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
title_full_unstemmed |
Establishing a ranking protocol of government procurement by using analytical hierarchy process(AHP) |
title_sort |
establishing a ranking protocol of government procurement by using analytical hierarchy process(ahp) |
publishDate |
2013 |
url |
http://ndltd.ncl.edu.tw/handle/95170939410739324193 |
work_keys_str_mv |
AT hunglungliao establishingarankingprotocolofgovernmentprocurementbyusinganalyticalhierarchyprocessahp AT liàohónglóng establishingarankingprotocolofgovernmentprocurementbyusinganalyticalhierarchyprocessahp AT hunglungliao yīngyòngcéngjífēnxīfǎahpjiànlìzhèngfǔcǎigòupíngxuǎnmóshì AT liàohónglóng yīngyòngcéngjífēnxīfǎahpjiànlìzhèngfǔcǎigòupíngxuǎnmóshì |
_version_ |
1718527005597630464 |