Grape-winemaking project scheduling with dynamic resource-constrained
碩士 === 輔仁大學 === 企業管理學系管理學碩士班 === 101 === The research of resource constrained project scheduling problem, planned schedules are often disrupted by some uncontrollable factors, so the project can not be completed as planned time to complete. This study consider the slack time, and use the slack time...
Main Authors: | CHEN, HONG-YE, 陳弘業 |
---|---|
Other Authors: | Rong-Hwa, Huang |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/30702940420457478186 |
Similar Items
-
Resource Constrained Project Scheduling With Dynamic Disruption Recovery
by: Forhad Zaman, et al.
Published: (2020-01-01) -
Resource Constrained Project Scheduling with Stochastic Resources
by: Furkan Uysal, et al.
Published: (2018-03-01) -
The Resource-Constrained Project Scheduling Problems with Resource Allocation and Scheduling
by: Shou-Chih Chu, et al. -
Memetic Algorithms for the Resource-Constrained Project Scheduling Problem
by: Zhi-Jie Chen, et al.
Published: (2005) -
The influence of different winemaking techniques on the extraction of grape tannins
by: Nel, Anton Pieter
Published: (2011)