An Evaluation of Subcontracting for Retaining Wall Formwork
碩士 === 逢甲大學 === 土木工程學系 === 101 === Most constructions now adopt the subcontract by lowest tender when carrying out the contract. Although this subcontract model is more convenient and easy to manage, we still need to think about if it has the the advantages of distracting risks and lowering fixed co...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/34297429923040171557 |
id |
ndltd-TW-101FCU05015052 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-101FCU050150522015-10-13T22:57:03Z http://ndltd.ncl.edu.tw/handle/34297429923040171557 An Evaluation of Subcontracting for Retaining Wall Formwork 營建工程自辦分包決策模式之研究-以一般道路擋土牆模板工程為例 李昭良 碩士 逢甲大學 土木工程學系 101 Most constructions now adopt the subcontract by lowest tender when carrying out the contract. Although this subcontract model is more convenient and easy to manage, we still need to think about if it has the the advantages of distracting risks and lowering fixed cost. Thus, on the part of a large construction company’s manager, he should take the very question -whether they can deal with partial construction into serious consideration. This research is to help managers to build up the effective model to evaluate make or buy decision based on value chain analysis and cost drivers in Portre’s”Competitive Advantage”.It also utilizes fixed cost and variable cost in the economic model to analyze the unit cost, then evaluate the constructions should adopt make or buy decision. In this case study, the research takes retaining wall formwork for example. First, break down value activities and set up the value chain. Next, evaluate make or buy decision of formwork through cost drivers. Finally, analyze the unit cost by the economic model. The outcome confirms that the retaining wall formwork has the potentiality to be made by construction company itself. And this leaves the managers to think about the ways further more. 卜君平 2013 學位論文 ; thesis 72 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 逢甲大學 === 土木工程學系 === 101 === Most constructions now adopt the subcontract by lowest tender when carrying out the contract. Although this subcontract model is more convenient and easy to manage, we still need to think about if it has the the advantages of distracting risks and lowering fixed cost. Thus, on the part of a large construction company’s manager, he should take the very question -whether they can deal with partial construction into serious consideration. This research is to help managers to build up the effective model to evaluate make or buy decision based on value chain analysis and cost drivers in Portre’s”Competitive Advantage”.It also utilizes fixed cost and variable cost in the economic model to analyze the unit cost, then evaluate the constructions should adopt make or buy decision.
In this case study, the research takes retaining wall formwork for example. First, break down value activities and set up the value chain. Next, evaluate make or buy decision of formwork through cost drivers. Finally, analyze the unit cost by the economic model. The outcome confirms that the retaining wall formwork has the potentiality to be made by construction company itself. And this leaves the managers to think about the ways further more.
|
author2 |
卜君平 |
author_facet |
卜君平 李昭良 |
author |
李昭良 |
spellingShingle |
李昭良 An Evaluation of Subcontracting for Retaining Wall Formwork |
author_sort |
李昭良 |
title |
An Evaluation of Subcontracting for Retaining Wall Formwork |
title_short |
An Evaluation of Subcontracting for Retaining Wall Formwork |
title_full |
An Evaluation of Subcontracting for Retaining Wall Formwork |
title_fullStr |
An Evaluation of Subcontracting for Retaining Wall Formwork |
title_full_unstemmed |
An Evaluation of Subcontracting for Retaining Wall Formwork |
title_sort |
evaluation of subcontracting for retaining wall formwork |
publishDate |
2013 |
url |
http://ndltd.ncl.edu.tw/handle/34297429923040171557 |
work_keys_str_mv |
AT lǐzhāoliáng anevaluationofsubcontractingforretainingwallformwork AT lǐzhāoliáng yíngjiàngōngchéngzìbànfēnbāojuécèmóshìzhīyánjiūyǐyībāndàolùdǎngtǔqiángmóbǎngōngchéngwèilì AT lǐzhāoliáng evaluationofsubcontractingforretainingwallformwork |
_version_ |
1718082002514608128 |