Cost estimation for a production scheduling and control system of a small company with permissible backordering
碩士 === 台灣首府大學 === 工業管理學系研究所 === 101 === Abstract Struggling to live in the 21 century, lots of small companies of which the production scheduling and control system (PSCS) are based on rules of thumb. While facing shortages and excess of inventory, they always do not have reliable data or efficient...
Main Authors: | Apichotwasurat Pitchanan, 陳維真 |
---|---|
Other Authors: | Fu,Kuo-En |
Format: | Others |
Language: | en_US |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96695444826987820832 |
Similar Items
-
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering
by: Kang, Chun Ta, et al.
Published: (2015) -
EMQ model with shortage backordering and imperfect production inspection schedule
by: Huang Ming Yi, et al.
Published: (2011) -
Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration
by: M. F. Yang, et al.
Published: (2014-01-01) -
Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision
by: Yuan-Shyi Peter Chiu, et al.
Published: (2018-10-01) -
A periodic review inventory model with stock dependent demand, permissible delay in payment and price discount on backorders
by: Pal Manisha, et al.
Published: (2014-01-01)