Summary: | 碩士 === 朝陽科技大學 === 營建工程系碩士班 === 101 === General buildings include construction, utilities, fire protection, air conditioning and weak current et al. Due to the sequence difference of each kind of work, thus there are many problems from construction interface. This study are summarized some of management problems and solution suggestions about each interface problems of Electrical and Mechanical and through the turnkey procurement and integrated drawing to compare the advantages and disadvantages in order to improve construction quality and progress.
The study represents the future development of building and piping system issues that to approach the most effective management of building and piping construction in order to improve future “construction quality”, “reduce costs” and “reduce engineering disputes " which will be summarized the conclusion and suggestion from the construction interface. Through 3-D construction drawings, and integrated drawing, the piping /utilities system can be continued by sequence and progress for the whole construction that to achieve the ideal project.
|