Determining production run for an (n+1) multi-delivery production-shipment system with random breakdown and perfect rework
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 101 === This study investigated the production run time of a single production containing the random machine breakdown, (n+1) multiple of delivery and perfect rework, the two-stage production and two-stage delivery. Assuming an imperfect production process that will...
Main Authors: | Chun-Chi Kuo, 郭鈞騏 |
---|---|
Other Authors: | Yuan-Shyi Peter Chiu |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/71541142386253748416 |
Similar Items
-
Joint determination of delivery and common cycle policy for system with imperfect rework, and the optimal production-shipment policy with breakdown and rework
by: Chih-Kai Chang, et al.
Published: (2012) -
Determining production cycle and multi-delivery policy for a multi-item manufacturing system with failure in rework,and production run time with machine breakdowns and imperfect rework.
by: Shin-wei Chen, et al.
Published: (2012) -
The economic production-shipment solutions for an integrated system with single-producer-multiple-customers, rework and (n+1) deliveries, and for a multi-item production system with rework and multiple shipments
by: Nong Pan, et al.
Published: (2011) -
Optimal batch size and number of deliveries for EPQ model with non-continuous shipments and perfect rework process
by: Chia-Ling Chung, et al.
Published: (2009) -
Determining the optimal production - shipment policy for EPQ model with multiple deliveries and repair of reworkable defective items
by: Ching-Yun Chang, et al.
Published: (2009)