On a Wire Bonding Machine's Shifting Production Problem in Consideration of the Time Value
碩士 === 中原大學 === 工業與系統工程研究所 === 101 === The semiconductor industry in Taiwan has achieved excellent performance in the past decades. Gartner’s statistics in April 2013 found that three of the top five global packaging and testing companies are from Taiwan, including ASE, SPIL, and PTI, thus proving t...
Main Authors: | Jia-Lun Kang, 康嘉倫 |
---|---|
Other Authors: | Dah-Chuan Gong |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/58644885186367780697 |
Similar Items
-
A study on production cost of wire bonding machine in IC assembly
by: 林煥雄
Published: (2009) -
A study on production cost of wire bonding machine in IC assembly
by: 林煥雄
Published: (2009) -
A vision problem in wire bonding
by: Mohd. Noor, Norliza, et al.
Published: (2000) -
Analysis of Clamping Material and Cost for Wire Fixture of Bonding Machine
by: WEI, ZHENG-TANG, et al.
Published: (2019) -
Yield-Driven Wiring and Via Improvement with Timing Consideration
by: Bo-Yi Chiang, et al.
Published: (2007)