An Investigation on the Time and Cost Management for Temporary Railway Construction Projects
碩士 === 中華大學 === 營建管理學系碩士在職專班 === 101 === The construction duration of a temporary railway project will affect the start of its future railway viaduct project. Since the temporary railway construction is a temporary facility, how to evaluate and consider its planning and design before construction an...
Main Authors: | Huang,Shang-hsiang, 黃尚祥 |
---|---|
Other Authors: | Yang,Hsi-Chi |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/25643662609990255223 |
Similar Items
-
Discussion on Temporary Rail Construction Practices before Railway Grade Separation
by: Cheng,Shih-Shung, et al.
Published: (2012) -
Risk Management of Construction Contractor for Design-Build Projects
by: Shang-Yuan Huang, et al.
Published: (2009) -
Cost and Time Risk Management in Construction Projects
by: Yousif Salam Saeed
Published: (2018-03-01) -
Determination of Direct to Indirect Accident Cost Ratio for Railway Construction Project
by: Nik Mohd Ainul Azman Nik Nur Khairunnisa, et al.
Published: (2019-01-01) -
System Dynamics in Project Risk Management: Reallocating the Contingency Cost under the Project Scope Change
by: Ching-I Shang, et al.
Published: (2002)