A Multi-stage Flow Shop Scheduling Problem with Resource Constraints and Limited Buffer
碩士 === 國立雲林科技大學 === 全球運籌管理研究所碩士班 === 100 === Recently, the improvement of technology is quite fast, so there are always old and new machines in a manufacturing factory. Hence this research added resource constraint and limited buffer to the problem assumption of unrelated parallel machines flowshop,...
Main Authors: | Ming-Hua Tsai, 蔡明樺 |
---|---|
Other Authors: | Chinyao Low |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/57638270358274775501 |
Similar Items
-
Hybrid Flow Shop Scheduling Problem with Lot-Streaming and Limited Buffer
by: Tien-Yi Huang, et al.
Published: (2014) -
An Immune Algorithm for Flow Shop Scheduling with Limited Buffers
by: He-Gun Tzeng, et al.
Published: (2008) -
Hybrid Flow-Shops Scheduling Problems with Multi- processors and Finite Intermediate Buffers
by: Yu-Hsuan Lee, et al.
Published: (2014) -
Job-shop scheduling with limited buffer capacities
by: Heitmann, Silvia
Published: (2007) -
A Hybrid Three-stage Flow Shop Scheduling Problem
by: Ching-Tai Tsai, et al.
Published: (2010)