A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma.
碩士 === 實踐大學 === 企業管理學系碩士在職專班 === 100 === In the development of globalization in the twenty first century, Taiwanese companies are facing the open market which is caused by WTO. Many countries, including China and Taiwan, are ready to enter the mainland China to set up factories, and it makes the cha...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/71971665264190316204 |
id |
ndltd-TW-100SCC00780015 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-100SCC007800152015-10-13T21:07:18Z http://ndltd.ncl.edu.tw/handle/71971665264190316204 A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. 植基於六標準差改善營建專案作業品質績效之探討 Fan,Chih Hsien 范智賢 碩士 實踐大學 企業管理學系碩士在職專班 100 In the development of globalization in the twenty first century, Taiwanese companies are facing the open market which is caused by WTO. Many countries, including China and Taiwan, are ready to enter the mainland China to set up factories, and it makes the changes and competitions of the market more intense. Nevertheless, for the firms of professional construction management, it does not work as simple as before that built up a task team in order to get the cases done. It needs a well-organized labor power and abundant construction experiences. Under the pressure of time, cost and limited resources, to develop a professional team’s management ability, also to adopt an effective communication to coordinate the whole working process in order to minimize the conflicts between the workers and to plan, enforce, control, and inspire all levels. And complete the operational goals under the regulations of costs and quality control. According to these indices, this research collects the relevant theses about the operations quality performance from Taiwan and foreign countries. Use a new factory to discuss the improvement of the operations quality performance of a construction project, and do this research through the DMAIC stages of Six Sigma, project management, and the professional construction management. By using the DMAIC stages of Six Sigma and the construction management to develop an integrated management. Also, hoping it can provide useful information to the project management. Through the research cases, this research first chooses a project and run it by the DMAIC. During the process, adopt the appropriate quality control to improve the performance and the consumer satisfaction in order to achieve the operational goals. The results of this research are: 1. Use the project management to develop a better project enforcement model to use in both management level and the technical level of a new factory, and also make the constructional process more systematic. 2. Combine the constructional system and the project management model to provide a SOP for the professional construction. 3. By using the DMACI stages of Six Sigma to analyze in order to improve the operations quality performance. Key words: DMAIC of Six Sigma、Project Management、Professional Construction Management、Operations Quality Performance 朱艷芳 博士 方國榮 博士 2012 學位論文 ; thesis 78 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 實踐大學 === 企業管理學系碩士在職專班 === 100 === In the development of globalization in the twenty first century, Taiwanese companies are facing the open market which is caused by WTO. Many countries, including China and Taiwan, are ready to enter the mainland China to set up factories, and it makes the changes and competitions of the market more intense. Nevertheless, for the firms of professional construction management, it does not work as simple as before that built up a task team in order to get the cases done. It needs a well-organized labor power and abundant construction experiences. Under the pressure of time, cost and limited resources, to develop a professional team’s management ability, also to adopt an effective communication to coordinate the whole working process in order to minimize the conflicts between the workers and to plan, enforce, control, and inspire all levels. And complete the operational goals under the regulations of costs and quality control.
According to these indices, this research collects the relevant theses about the operations quality performance from Taiwan and foreign countries. Use a new factory to discuss the improvement of the operations quality performance of a construction project, and do this research through the DMAIC stages of Six Sigma, project management, and the professional construction management. By using the DMAIC stages of Six Sigma and the construction management to develop an integrated management. Also, hoping it can provide useful information to the project management.
Through the research cases, this research first chooses a project and run it by the DMAIC. During the process, adopt the appropriate quality control to improve the performance and the consumer satisfaction in order to achieve the operational goals. The results of this research are:
1. Use the project management to develop a better project enforcement model to use in both management level and the technical level of a new factory, and also make the constructional process more systematic.
2. Combine the constructional system and the project management model to provide a SOP for the professional construction.
3. By using the DMACI stages of Six Sigma to analyze in order to improve the operations quality performance.
Key words: DMAIC of Six Sigma、Project Management、Professional Construction Management、Operations Quality Performance
|
author2 |
朱艷芳 博士 |
author_facet |
朱艷芳 博士 Fan,Chih Hsien 范智賢 |
author |
Fan,Chih Hsien 范智賢 |
spellingShingle |
Fan,Chih Hsien 范智賢 A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
author_sort |
Fan,Chih Hsien |
title |
A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
title_short |
A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
title_full |
A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
title_fullStr |
A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
title_full_unstemmed |
A Study of Improving Quality Performance of the Construction Operation Projects Based on Six Sigma. |
title_sort |
study of improving quality performance of the construction operation projects based on six sigma. |
publishDate |
2012 |
url |
http://ndltd.ncl.edu.tw/handle/71971665264190316204 |
work_keys_str_mv |
AT fanchihhsien astudyofimprovingqualityperformanceoftheconstructionoperationprojectsbasedonsixsigma AT fànzhìxián astudyofimprovingqualityperformanceoftheconstructionoperationprojectsbasedonsixsigma AT fanchihhsien zhíjīyúliùbiāozhǔnchàgǎishànyíngjiànzhuānànzuòyèpǐnzhìjīxiàozhītàntǎo AT fànzhìxián zhíjīyúliùbiāozhǔnchàgǎishànyíngjiànzhuānànzuòyèpǐnzhìjīxiàozhītàntǎo AT fanchihhsien studyofimprovingqualityperformanceoftheconstructionoperationprojectsbasedonsixsigma AT fànzhìxián studyofimprovingqualityperformanceoftheconstructionoperationprojectsbasedonsixsigma |
_version_ |
1718056456001945600 |