Batch scheduling problems for two-stage assembly shop
博士 === 國立臺灣科技大學 === 工業管理系 === 100 === In this thesis, we consider the batch scheduling problems for two-stage assembly shop, which are frequently encountered in the machinery manufacturing. In the first stage, a fixed number of jobs are assembled on a batch machine with a common processing time. The...
Main Authors: | CHUNG-HUA LIN, 林宗華 |
---|---|
Other Authors: | Ching-Jong Liao |
Format: | Others |
Language: | en_US |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/35601029398409794068 |
Similar Items
-
Batch Scheduling In A Two-Stage Flexible Flow Shop Problem
by: Gerstl Enrique, et al.
Published: (2014-02-01) -
A Two-Stage Assembly Scheduling Problem with Batch Setup Time
by: Hung-chieh Li, et al.
Published: (2013) -
Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines
by: m. bashi varshosaz, et al.
Published: (2018-09-01) -
Two‐stage Unrelated Multiprocessor Flow Shop Scheduling with Batch and Job Arrival.
by: Jia-Rong Li, et al.
Published: (2015) -
Lot Steaming and Batch Processor in Hybrid Flow Shop Scheduling Problem – A Case for Semiconductor Assembly Factory
by: 黃謙研
Published: (2014)