Engineering Construction Management- A Case Study on C Company's Oil Storage Tank Engineering
碩士 === 國立臺灣科技大學 === 工業管理系 === 100 === The target of engineering management is to make engineering work progressing smoothly and achieve the expected quality. Good or bad engineering management not only affects the cost, progress, quality, and safety of engineering but also implicates the cost of mai...
Main Authors: | Chaur-Chang Weng, 翁朝章 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/32047588446337368012 |
Similar Items
-
Numerical Analysis of Influence of Engineering Construction in the Area of Placing Fuel Storage Tanks on their Heat Loss
by: Polovnikov V. Yu., et al.
Published: (2016-01-01) -
Construction Engineering Safety and hygiene Management Law And AnalyzeDebase Construction Engineering Occupation's calamity Disaster Research
by: Jen-Cheng Weng, et al.
Published: (2005) -
The Study of Planning and Construction Management of Petrochemical Storage Tank—An Example of PCM Petrochemical Company
by: LIN, Hsi-Cheng, et al.
Published: (2017) -
Knowledge management in construction and engineering consulting companies in Gauteng.
by: Maraura, Andrew.
Published: (2015) -
Effects of foundation settlement on oil storage tanks
by: Kamyab, Hossain
Published: (1989)