The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study

碩士 === 國立臺灣大學 === 森林環境暨資源學研究所 === 100 === Developing wind power is an international trend and Taiwan maintains the potential to develop this energy. Taiwan initiated renewable energy development after 1998. However, because wind power has not yet achieved economic efficacy, government reward pol...

Full description

Bibliographic Details
Main Authors: Sheng-Che Lin, 林聖哲
Other Authors: 鄭欽龍
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/56218818914073512297
id ndltd-TW-100NTU05359018
record_format oai_dc
spelling ndltd-TW-100NTU053590182015-10-13T21:50:16Z http://ndltd.ncl.edu.tw/handle/56218818914073512297 The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study 臺灣發展再生能源的困境-以風力發電為例之探討 Sheng-Che Lin 林聖哲 碩士 國立臺灣大學 森林環境暨資源學研究所 100 Developing wind power is an international trend and Taiwan maintains the potential to develop this energy. Taiwan initiated renewable energy development after 1998. However, because wind power has not yet achieved economic efficacy, government reward policies are required for wind power development. Because of the influence of various interest groups, the “Renewable Energy Development Act” was delayed for years. Therefore, we investigated governmental regulation of the renewable energy industry to analyze the rent-seeking activities and influence of wind power firms in the Legislative Yuan and the market. In April 2009, the German wind power firm InfraVest planned to withdraw capital because of the delayed Renewable Energy Development Act draft. The act was then passed in July 2009. According to the Renewable Energy Development Act, the Taiwan Power Company (Taipower) should purchase the power produced by renewable energy firms. However, InfraVest was not satisfied with the low rate of feed-in tariff established by the Bureau of Energy, Ministry of Economic Affairs and again proposed the withdrawal of capital. Therefore, we analyzed and compared the wind power generation costs of InfraVest and Taipower. The results showed that the initial capital costs and annual operating and maintenance costs of Taipower’s wind power generation were lower compared to those of InfraVest. The first reason Taipower had lower costs is that Taipower uses more than two power generation methods. Shared resources result in reduced power generation costs. The second reason is that Taipower has attempted to reduce power generation costs to influence the rate decisions of the Bureau of Energy. This establishes an entry barrier for other renewable energy firms. Therefore, potential competitors are excluded. 鄭欽龍 2012 學位論文 ; thesis 84 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 森林環境暨資源學研究所 === 100 === Developing wind power is an international trend and Taiwan maintains the potential to develop this energy. Taiwan initiated renewable energy development after 1998. However, because wind power has not yet achieved economic efficacy, government reward policies are required for wind power development. Because of the influence of various interest groups, the “Renewable Energy Development Act” was delayed for years. Therefore, we investigated governmental regulation of the renewable energy industry to analyze the rent-seeking activities and influence of wind power firms in the Legislative Yuan and the market. In April 2009, the German wind power firm InfraVest planned to withdraw capital because of the delayed Renewable Energy Development Act draft. The act was then passed in July 2009. According to the Renewable Energy Development Act, the Taiwan Power Company (Taipower) should purchase the power produced by renewable energy firms. However, InfraVest was not satisfied with the low rate of feed-in tariff established by the Bureau of Energy, Ministry of Economic Affairs and again proposed the withdrawal of capital. Therefore, we analyzed and compared the wind power generation costs of InfraVest and Taipower. The results showed that the initial capital costs and annual operating and maintenance costs of Taipower’s wind power generation were lower compared to those of InfraVest. The first reason Taipower had lower costs is that Taipower uses more than two power generation methods. Shared resources result in reduced power generation costs. The second reason is that Taipower has attempted to reduce power generation costs to influence the rate decisions of the Bureau of Energy. This establishes an entry barrier for other renewable energy firms. Therefore, potential competitors are excluded.
author2 鄭欽龍
author_facet 鄭欽龍
Sheng-Che Lin
林聖哲
author Sheng-Che Lin
林聖哲
spellingShingle Sheng-Che Lin
林聖哲
The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
author_sort Sheng-Che Lin
title The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
title_short The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
title_full The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
title_fullStr The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
title_full_unstemmed The Dilemma of Developing Renewable Energy in Taiwan-A Wind Power Case Study
title_sort dilemma of developing renewable energy in taiwan-a wind power case study
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/56218818914073512297
work_keys_str_mv AT shengchelin thedilemmaofdevelopingrenewableenergyintaiwanawindpowercasestudy
AT línshèngzhé thedilemmaofdevelopingrenewableenergyintaiwanawindpowercasestudy
AT shengchelin táiwānfāzhǎnzàishēngnéngyuándekùnjìngyǐfēnglìfādiànwèilìzhītàntǎo
AT línshèngzhé táiwānfāzhǎnzàishēngnéngyuándekùnjìngyǐfēnglìfādiànwèilìzhītàntǎo
AT shengchelin dilemmaofdevelopingrenewableenergyintaiwanawindpowercasestudy
AT línshèngzhé dilemmaofdevelopingrenewableenergyintaiwanawindpowercasestudy
_version_ 1718068184267882496