Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
碩士 === 國立臺灣大學 === 工業工程學研究所 === 100 === Sequential process queue time constraints are important properties in semiconductor and TFT-LCD manufacturing. In these factories, any time violation will result in significant scrap or rework costs. Besides, most process in those industries are stochastic....
Main Authors: | Chun-Hsiang Tseng, 曾俊翔 |
---|---|
Other Authors: | 吳政鴻 |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/54678291343959728704 |
Similar Items
-
Production Control in Parallel Multi-tool Systems under Sequential Process Queue Time Constraints
by: Bo-Chen Pan, et al.
Published: (2014) -
Integration of Multi-stage Manufacturing Shops with Queue-time Constraint
by: Cheng-Hao Huang, et al.
Published: (2010) -
Production Control in Batch and Multi-product Manufacturing Systems under Process Queue Time Constraints
by: Yu-Ching Cheng, et al.
Published: (2010) -
Production Control in Multi-product Systems with Common Machines under Process Queue Time Constraints
by: Yu-Ting Chen, et al.
Published: (2016) -
Dynamic multi-stage tandem queue modeling-based congestion adaptive routing for MANET
by: A. Amuthan, et al.
Published: (2018-09-01)