Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints

碩士 === 國立臺灣大學 === 工業工程學研究所 === 100 === Sequential process queue time constraints are important properties in semiconductor and TFT-LCD manufacturing. In these factories, any time violation will result in significant scrap or rework costs. Besides, most process in those industries are stochastic....

Full description

Bibliographic Details
Main Authors: Chun-Hsiang Tseng, 曾俊翔
Other Authors: 吳政鴻
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/54678291343959728704
id ndltd-TW-100NTU05030005
record_format oai_dc
spelling ndltd-TW-100NTU050300052016-04-04T04:17:30Z http://ndltd.ncl.edu.tw/handle/54678291343959728704 Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints 連續作業等候時間限制下之多工作站生產系統控制 Chun-Hsiang Tseng 曾俊翔 碩士 國立臺灣大學 工業工程學研究所 100 Sequential process queue time constraints are important properties in semiconductor and TFT-LCD manufacturing. In these factories, any time violation will result in significant scrap or rework costs. Besides, most process in those industries are stochastic. Without accurate production control in such systems, production yield rate will decrease and production cost will increase. This research considers sequential process queue time constraints in multi-stage tandems production systems. The objective is to minimize production costs which are include inventory holding cost and scrap cost. We use dynamic programming and uniformization method to model these systems. However, the model is too complex to solve in feasible time. Therefore, we use decomposition and pairing heuristic control (PHC) policy to fix complexity problem. To verify the robustness and effectiveness of the proposed model, we use discrete event simulation (DES) to compare the performance of PHC with other policies’ in literatures. 吳政鴻 2012 學位論文 ; thesis 98 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 工業工程學研究所 === 100 === Sequential process queue time constraints are important properties in semiconductor and TFT-LCD manufacturing. In these factories, any time violation will result in significant scrap or rework costs. Besides, most process in those industries are stochastic. Without accurate production control in such systems, production yield rate will decrease and production cost will increase. This research considers sequential process queue time constraints in multi-stage tandems production systems. The objective is to minimize production costs which are include inventory holding cost and scrap cost. We use dynamic programming and uniformization method to model these systems. However, the model is too complex to solve in feasible time. Therefore, we use decomposition and pairing heuristic control (PHC) policy to fix complexity problem. To verify the robustness and effectiveness of the proposed model, we use discrete event simulation (DES) to compare the performance of PHC with other policies’ in literatures.
author2 吳政鴻
author_facet 吳政鴻
Chun-Hsiang Tseng
曾俊翔
author Chun-Hsiang Tseng
曾俊翔
spellingShingle Chun-Hsiang Tseng
曾俊翔
Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
author_sort Chun-Hsiang Tseng
title Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
title_short Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
title_full Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
title_fullStr Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
title_full_unstemmed Production Control in Multi-stage Tandems Systems under Sequential Process Queue Time Constraints
title_sort production control in multi-stage tandems systems under sequential process queue time constraints
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/54678291343959728704
work_keys_str_mv AT chunhsiangtseng productioncontrolinmultistagetandemssystemsundersequentialprocessqueuetimeconstraints
AT céngjùnxiáng productioncontrolinmultistagetandemssystemsundersequentialprocessqueuetimeconstraints
AT chunhsiangtseng liánxùzuòyèděnghòushíjiānxiànzhìxiàzhīduōgōngzuòzhànshēngchǎnxìtǒngkòngzhì
AT céngjùnxiáng liánxùzuòyèděnghòushíjiānxiànzhìxiàzhīduōgōngzuòzhànshēngchǎnxìtǒngkòngzhì
_version_ 1718215504966975488