Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital

博士 === 國立臺灣大學 === 土木工程學研究所 === 100 === Most of the architectural designers, the field workers and the inspectors lack of the concepts and the techniques of building biosafety facilities and isolation wards. They rely on the client’s experiences and the requirement instruction, which cannot coordinat...

Full description

Bibliographic Details
Main Authors: Chi-Su Tai, 戴期甦
Other Authors: 郭斯傑
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/34209119578662976311
id ndltd-TW-100NTU05015002
record_format oai_dc
spelling ndltd-TW-100NTU050150022016-04-04T04:17:29Z http://ndltd.ncl.edu.tw/handle/34209119578662976311 Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital 高階生物安全隔離病房技術整合與確效管理之研究 Chi-Su Tai 戴期甦 博士 國立臺灣大學 土木工程學研究所 100 Most of the architectural designers, the field workers and the inspectors lack of the concepts and the techniques of building biosafety facilities and isolation wards. They rely on the client’s experiences and the requirement instruction, which cannot coordinate both the medical and the construction disciplines in an efficient manner. Without the efficient cooperation, it is impossible to build the biosafety level compliance isolation wards in time to accommodate the infected patients to stop the spreading of the diseases. This study firstly coordinates the various demanding systems within the construction interfaces and management issues, and links the product quality and the management quality, so that the RBS of building the biosafety level isolation wards can be established. The study secondly coordinates the management mechanism in order to ensure the implementing efficiency. The management mechanism is to identify the work items of the core techniques with the IIW process and the IMM. As a result, every functional system and issue of interfaces is clarified by various building stages and the IMD is therefore possibly to be established. This study combines the results of above mentioned approaches, and eventually derives the “6Q+3V” validation management methodology. The validation management integrates the concepts of biosafety, affection prevention techniques, construction techniques, and medical facility installation techniques, and provides the appropriate procedures and means, such as CoSD and CVT, for the building and the operation. The 6Q, including DQ, CQ, EQ, IQ, OQ and PQ, are a series of validations of various building and operation stages. The 3V, including BV, PV and MV, are implemented in the whole life cycle. These validations and qualifications guarantee that the demands will be met, and the expected functions will be stable and continuous. The validation management program constructed in this study may be applied in every kind of buildings to improve the total quality, and bring the present quality management system to the level of Total Quality Management (TQM). 郭斯傑 2011 學位論文 ; thesis 105 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 博士 === 國立臺灣大學 === 土木工程學研究所 === 100 === Most of the architectural designers, the field workers and the inspectors lack of the concepts and the techniques of building biosafety facilities and isolation wards. They rely on the client’s experiences and the requirement instruction, which cannot coordinate both the medical and the construction disciplines in an efficient manner. Without the efficient cooperation, it is impossible to build the biosafety level compliance isolation wards in time to accommodate the infected patients to stop the spreading of the diseases. This study firstly coordinates the various demanding systems within the construction interfaces and management issues, and links the product quality and the management quality, so that the RBS of building the biosafety level isolation wards can be established. The study secondly coordinates the management mechanism in order to ensure the implementing efficiency. The management mechanism is to identify the work items of the core techniques with the IIW process and the IMM. As a result, every functional system and issue of interfaces is clarified by various building stages and the IMD is therefore possibly to be established. This study combines the results of above mentioned approaches, and eventually derives the “6Q+3V” validation management methodology. The validation management integrates the concepts of biosafety, affection prevention techniques, construction techniques, and medical facility installation techniques, and provides the appropriate procedures and means, such as CoSD and CVT, for the building and the operation. The 6Q, including DQ, CQ, EQ, IQ, OQ and PQ, are a series of validations of various building and operation stages. The 3V, including BV, PV and MV, are implemented in the whole life cycle. These validations and qualifications guarantee that the demands will be met, and the expected functions will be stable and continuous. The validation management program constructed in this study may be applied in every kind of buildings to improve the total quality, and bring the present quality management system to the level of Total Quality Management (TQM).
author2 郭斯傑
author_facet 郭斯傑
Chi-Su Tai
戴期甦
author Chi-Su Tai
戴期甦
spellingShingle Chi-Su Tai
戴期甦
Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
author_sort Chi-Su Tai
title Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
title_short Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
title_full Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
title_fullStr Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
title_full_unstemmed Integration of Core Techniques and Validation for High Bio-safety Level Isolation Wards in Hospital
title_sort integration of core techniques and validation for high bio-safety level isolation wards in hospital
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/34209119578662976311
work_keys_str_mv AT chisutai integrationofcoretechniquesandvalidationforhighbiosafetylevelisolationwardsinhospital
AT dàiqīsū integrationofcoretechniquesandvalidationforhighbiosafetylevelisolationwardsinhospital
AT chisutai gāojiēshēngwùānquángélíbìngfángjìshùzhěnghéyǔquèxiàoguǎnlǐzhīyánjiū
AT dàiqīsū gāojiēshēngwùānquángélíbìngfángjìshùzhěnghéyǔquèxiàoguǎnlǐzhīyánjiū
_version_ 1718215498323197952