Study of Survey Accuracy Control and Survey Models of Shield Tunnel
碩士 === 國立臺灣海洋大學 === 河海工程學系 === 100 === With rapid development of metropolis transportation, the MRT underground projects have to be implemented among existing crowded buildings. Shield Tunnel thus becomes the most efficient, secure and clean way of boring adopted nowadays to connect both end station...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/87004557778858953913 |
id |
ndltd-TW-100NTOU5192022 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-100NTOU51920222015-10-13T22:01:08Z http://ndltd.ncl.edu.tw/handle/87004557778858953913 Study of Survey Accuracy Control and Survey Models of Shield Tunnel 潛盾隧道測量精度控制與測量模式之探討 Po- Hung Lin 林柏宏 碩士 國立臺灣海洋大學 河海工程學系 100 With rapid development of metropolis transportation, the MRT underground projects have to be implemented among existing crowded buildings. Shield Tunnel thus becomes the most efficient, secure and clean way of boring adopted nowadays to connect both end stations. However, it is not easy for control measurement to reach the High Accuracy Deviation Tolerance that MRT specifications required, especially in the narrow space of working wells on both ends with over 20 meters height different from the ground; more importantly, to avoid boundary dispute with adjacent buildings in the valuable metropolis land. Therefore, the MRT Shield Tunneling measurement is more important but difficult than other civil engineering. The study of this thesis includes analysis of variable existing measurement theories and Shield Tunnel control measurement modes. To increase the measurement accuracy and decrease contrived or equipment deviation, the study takes example of substantial measuring from Taipei MRT Xinyi line sectional contract CR580B, also applies tunnel vacuum analysis software to monitor the vacuum survey results. To the end, the study builds up a Shield Tunnel measurement mode which not only can comply with contract requirements, shorten process time on site, improve measuring efficiency and engineering quality, but also can provide related engineering for reference in future. Jing-Jong Jang 張景鐘 2012 學位論文 ; thesis 118 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣海洋大學 === 河海工程學系 === 100 === With rapid development of metropolis transportation, the MRT underground projects have to be implemented among existing crowded buildings. Shield Tunnel thus becomes the most efficient, secure and clean way of boring adopted nowadays to connect both end stations. However, it is not easy for control measurement to reach the High Accuracy Deviation Tolerance that MRT specifications required, especially in the narrow space of working wells on both ends with over 20 meters height different from the ground; more importantly, to avoid boundary dispute with adjacent buildings in the valuable metropolis land. Therefore, the MRT Shield Tunneling measurement is more important but difficult than other civil engineering.
The study of this thesis includes analysis of variable existing measurement theories and Shield Tunnel control measurement modes. To increase the measurement accuracy and decrease contrived or equipment deviation, the study takes example of substantial measuring from Taipei MRT Xinyi line sectional contract CR580B, also applies tunnel vacuum analysis software to monitor the vacuum survey results. To the end, the study builds up a Shield Tunnel measurement mode which not only can comply with contract requirements, shorten process time on site, improve measuring efficiency and engineering quality, but also can provide related engineering for reference in future.
|
author2 |
Jing-Jong Jang |
author_facet |
Jing-Jong Jang Po- Hung Lin 林柏宏 |
author |
Po- Hung Lin 林柏宏 |
spellingShingle |
Po- Hung Lin 林柏宏 Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
author_sort |
Po- Hung Lin |
title |
Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
title_short |
Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
title_full |
Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
title_fullStr |
Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
title_full_unstemmed |
Study of Survey Accuracy Control and Survey Models of Shield Tunnel |
title_sort |
study of survey accuracy control and survey models of shield tunnel |
publishDate |
2012 |
url |
http://ndltd.ncl.edu.tw/handle/87004557778858953913 |
work_keys_str_mv |
AT pohunglin studyofsurveyaccuracycontrolandsurveymodelsofshieldtunnel AT línbǎihóng studyofsurveyaccuracycontrolandsurveymodelsofshieldtunnel AT pohunglin qiándùnsuìdàocèliàngjīngdùkòngzhìyǔcèliàngmóshìzhītàntǎo AT línbǎihóng qiándùnsuìdàocèliàngjīngdùkòngzhìyǔcèliàngmóshìzhītàntǎo |
_version_ |
1718071415205265408 |