Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments
碩士 === 國立中山大學 === 電機工程學系研究所 === 100 === Taipower Company has already completed the installation of the Outage Management System (OMS) in all service districts. The attributes of all distribution equipments and customers have been included in the computerized mapping system. However, the phasing attr...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/66516014200480079843 |
id |
ndltd-TW-100NSYS5442058 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-100NSYS54420582015-10-13T21:22:18Z http://ndltd.ncl.edu.tw/handle/66516014200480079843 Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments 相位量測系統之設計及應用於配電設備相別辨識 Mei-Ching Wu 吳美靜 碩士 國立中山大學 電機工程學系研究所 100 Taipower Company has already completed the installation of the Outage Management System (OMS) in all service districts. The attributes of all distribution equipments and customers have been included in the computerized mapping system. However, the phasing attributes of distribution transformers are not very accurate in the database because they are very difficult to be identified for the distribution systems. The phase information of transformers in the OMS database is often inconsistent with the actual service phase, which deteriorates the performance of distribution system analysis, planning, and operation of Taipower distribution systems. The objective of this thesis is to develop an innovative Phasor Measurement Unit (PMU) to support the phasing identification of distribution transformers in a very effective way. The proposed PMU is used to measure the low voltage signal at the secondary side of transformers to prevent the survey personnel from safety problem. With the measured phases information of distribution transformers stored in the embedded system, the attributes of transformer phases in OMS can be updated to improve the accuracy of database. For the underground distribution systems, it is very difficult to receive the 1PPS signal of GPS system for timing synchronous to support the proposed transformer phasing measurement because all transformers are located at the building basement. This thesis proposes a timing synchronous module by using the Temperature Compensated Crystal Oscillator, TCXO to maintain the timing accuracy with high precision. Before executing the phasing measurement, this module is calibrated using the GPS 1PPS signal with fuzzy control calibration algorithm. It is found that the proposed PMU module can maintain the timing synchronous with 6˚, during two hours time period which will support the transformer phasing measurement by providing the reference timing synchronous even without the GPS 1PPS signal. Chao-Shun Chen 陳朝順 2012 學位論文 ; thesis 104 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中山大學 === 電機工程學系研究所 === 100 === Taipower Company has already completed the installation of the Outage Management System (OMS) in all service districts. The attributes of all distribution equipments and customers have been included in the computerized mapping system. However, the phasing attributes of distribution transformers are not very accurate in the database because they are very difficult to be identified for the distribution systems. The phase information of transformers in the OMS database is often inconsistent with the actual service phase, which deteriorates the performance of distribution system analysis, planning, and operation of Taipower distribution systems. The objective of this thesis is to develop an innovative Phasor Measurement Unit (PMU) to support the phasing identification of distribution transformers in a very effective way. The proposed PMU is used to measure the low voltage signal at the secondary side of transformers to prevent the survey personnel from safety problem. With the measured phases information of distribution transformers stored in the embedded system, the attributes of transformer phases in OMS can be updated to improve the accuracy of database. For the underground distribution systems, it is very difficult to receive the 1PPS signal of GPS system for timing synchronous to support the proposed transformer phasing measurement because all transformers are located at the building basement. This thesis proposes a timing synchronous module by using the Temperature Compensated Crystal Oscillator, TCXO to maintain the timing accuracy with high precision. Before executing the phasing measurement, this module is calibrated using the GPS 1PPS signal with fuzzy control calibration algorithm. It is found that the proposed PMU module can maintain the timing synchronous with 6˚, during two hours time period which will support the transformer phasing measurement by providing the reference timing synchronous even without the GPS 1PPS signal.
|
author2 |
Chao-Shun Chen |
author_facet |
Chao-Shun Chen Mei-Ching Wu 吳美靜 |
author |
Mei-Ching Wu 吳美靜 |
spellingShingle |
Mei-Ching Wu 吳美靜 Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
author_sort |
Mei-Ching Wu |
title |
Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
title_short |
Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
title_full |
Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
title_fullStr |
Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
title_full_unstemmed |
Design of Phasor Measurement Unit and Its Application to Phasing Recognition of Distribution Equipments |
title_sort |
design of phasor measurement unit and its application to phasing recognition of distribution equipments |
publishDate |
2012 |
url |
http://ndltd.ncl.edu.tw/handle/66516014200480079843 |
work_keys_str_mv |
AT meichingwu designofphasormeasurementunitanditsapplicationtophasingrecognitionofdistributionequipments AT wúměijìng designofphasormeasurementunitanditsapplicationtophasingrecognitionofdistributionequipments AT meichingwu xiāngwèiliàngcèxìtǒngzhīshèjìjíyīngyòngyúpèidiànshèbèixiāngbiébiànshí AT wúměijìng xiāngwèiliàngcèxìtǒngzhīshèjìjíyīngyòngyúpèidiànshèbèixiāngbiébiànshí |
_version_ |
1718060578795159552 |