An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project

碩士 === 國立中央大學 === 營建管理研究所碩士在職專班 === 100 === An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project Abstract Construction of industry factory all over the world, such as hydro-carbon, power plant, incineration plant and steel mill, there was industry safety inc...

Full description

Bibliographic Details
Main Authors: Ching-Nan Lu, 盧慶南
Other Authors: Ting-Ya Hsieh
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/51987895153656778381
id ndltd-TW-100NCU05512003
record_format oai_dc
spelling ndltd-TW-100NCU055120032015-10-13T21:22:21Z http://ndltd.ncl.edu.tw/handle/51987895153656778381 An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project 捷運統包工程供電系統完工測試之經驗學習 Ching-Nan Lu 盧慶南 碩士 國立中央大學 營建管理研究所碩士在職專班 100 An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project Abstract Construction of industry factory all over the world, such as hydro-carbon, power plant, incineration plant and steel mill, there was industry safety incident or resulted in system malfunction. Revenue service schedule were affected. . Difference with factory, test on completion for MRT system is related with rapid transportation. The key issue is passenger immediately evacuated and system restore soonest after outage. Expound is entering from project management point of view to the subject. Collect potential case from stage of planning, procurement/manufacturing and construction which may impact test on completion. In order to minimize defect during test on completion and promote management efficiency, through verification by specialist, present corrective and preventive measures. Most of test on completion are just single equipment test. However, test of completion for power supply including many different function subsystems. To achieve single subsystem test and integration among subsystems, all teams under project organization should follow instructions and make efforts. On the other words, by using manpower to accomplish work, it requires a procedure for integration of test on completion. To aim final target of project completion and optimization of equipment delivery, project orientation is the goal. Test of completion can be considered as a small project under big project. Project management is a key role for test of completion Key word: Bulk Supply Substation, Traction Power Substation, Station Substation, Power Remote Control System and Test On Completion. Ting-Ya Hsieh 謝定亞 2012 學位論文 ; thesis 116 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 營建管理研究所碩士在職專班 === 100 === An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project Abstract Construction of industry factory all over the world, such as hydro-carbon, power plant, incineration plant and steel mill, there was industry safety incident or resulted in system malfunction. Revenue service schedule were affected. . Difference with factory, test on completion for MRT system is related with rapid transportation. The key issue is passenger immediately evacuated and system restore soonest after outage. Expound is entering from project management point of view to the subject. Collect potential case from stage of planning, procurement/manufacturing and construction which may impact test on completion. In order to minimize defect during test on completion and promote management efficiency, through verification by specialist, present corrective and preventive measures. Most of test on completion are just single equipment test. However, test of completion for power supply including many different function subsystems. To achieve single subsystem test and integration among subsystems, all teams under project organization should follow instructions and make efforts. On the other words, by using manpower to accomplish work, it requires a procedure for integration of test on completion. To aim final target of project completion and optimization of equipment delivery, project orientation is the goal. Test of completion can be considered as a small project under big project. Project management is a key role for test of completion Key word: Bulk Supply Substation, Traction Power Substation, Station Substation, Power Remote Control System and Test On Completion.
author2 Ting-Ya Hsieh
author_facet Ting-Ya Hsieh
Ching-Nan Lu
盧慶南
author Ching-Nan Lu
盧慶南
spellingShingle Ching-Nan Lu
盧慶南
An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
author_sort Ching-Nan Lu
title An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
title_short An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
title_full An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
title_fullStr An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
title_full_unstemmed An Experience Learning of Test On Completion for MRT Power Supply System E/P/C Turnkey Project
title_sort experience learning of test on completion for mrt power supply system e/p/c turnkey project
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/51987895153656778381
work_keys_str_mv AT chingnanlu anexperiencelearningoftestoncompletionformrtpowersupplysystemepcturnkeyproject
AT lúqìngnán anexperiencelearningoftestoncompletionformrtpowersupplysystemepcturnkeyproject
AT chingnanlu jiéyùntǒngbāogōngchénggōngdiànxìtǒngwángōngcèshìzhījīngyànxuéxí
AT lúqìngnán jiéyùntǒngbāogōngchénggōngdiànxìtǒngwángōngcèshìzhījīngyànxuéxí
AT chingnanlu experiencelearningoftestoncompletionformrtpowersupplysystemepcturnkeyproject
AT lúqìngnán experiencelearningoftestoncompletionformrtpowersupplysystemepcturnkeyproject
_version_ 1718061305778143232