Production Scheduling for Wire Bach-Size when Maximizing Profit and Minimizing Loss Ratio with Delivery Constraint
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 100 === With the rapid development of the CCFL (Cold Cathode Fluorescent Lamps) technology and its related applications in Taiwan, the wide use of the CCFL is the industrial use in backlight of LCD (Liquid Crystal Display).The key component of CCFL is the cathode....
Main Authors: | Yen,Wei-Kai, 顏尉凱 |
---|---|
Other Authors: | Chang,Yung-Chia |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/47933254310885201117 |
Similar Items
-
The Analyze of the Link between Minimizing Production Costs and Maximizing Profits
by: Cătălin Angelo Ioan
Published: (2019-05-01) -
A Profit Maximization Scheme in Cloud Computing With Deadline Constraints
by: Siyi Chen, et al.
Published: (2020-01-01) -
Profit Maximization Model with Fare Structures and Subsidy Constraints for Urban Rail Transit
by: Qing Wang, et al.
Published: (2021-01-01) -
MAKESPAN MINIMIZATION FOR PARALLEL MACHINES SCHEDULING WITH AVAILABILITY CONSTRAINTS
by: Hashemian, Navid
Published: (2010) -
Cortical Composition Hierarchy Driven by Spine Proportion Economical Maximization or Wire Volume Minimization.
by: Jan Karbowski
Published: (2015-10-01)