An Alternative Pricing Framework for the Mongolian Rail Network

碩士 === 國立成功大學 === 國際經營管理研究所碩士班 === 100 === This study examines the result of infrastructure vertical separation in Mongolian railway. Mongolian railway started railway reform it include a lot of steps with the aim of increase railway capacity and performance. One main step is to implement infrastruc...

Full description

Bibliographic Details
Main Authors: BatmyagmarMyagmar, 馬映永
Other Authors: Alan J. Webb
Format: Others
Language:en_US
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/87725691370653538008
id ndltd-TW-100NCKU5321022
record_format oai_dc
spelling ndltd-TW-100NCKU53210222015-10-13T21:33:11Z http://ndltd.ncl.edu.tw/handle/87725691370653538008 An Alternative Pricing Framework for the Mongolian Rail Network An Alternative Pricing Framework for the Mongolian Rail Network BatmyagmarMyagmar 馬映永 碩士 國立成功大學 國際經營管理研究所碩士班 100 This study examines the result of infrastructure vertical separation in Mongolian railway. Mongolian railway started railway reform it include a lot of steps with the aim of increase railway capacity and performance. One main step is to implement infrastructure vertical separation and to find out optimal Infrastructure charging price. We used secondary data from Ulaabaatar Railway and Authority of Mongolian railway from 2005 to 2011. In order to see the infrastructure vertical separation result we have chosen possible infrastructure charging price then forecasted necessarily variable until 2014 after that formulated LP model. The results of this study suggest that, infrastructure vertical separation can increase the Mongolian railway capacity with less government cost compared with direct investment to UBR. Beginning of study we considered suitable infrastructure charging price important for private investment. The results also suggest that obligation level from government is another technique to promote private company investment in Mongolian case. Alan J. Webb 耶偉倫 2012 學位論文 ; thesis 79 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 國際經營管理研究所碩士班 === 100 === This study examines the result of infrastructure vertical separation in Mongolian railway. Mongolian railway started railway reform it include a lot of steps with the aim of increase railway capacity and performance. One main step is to implement infrastructure vertical separation and to find out optimal Infrastructure charging price. We used secondary data from Ulaabaatar Railway and Authority of Mongolian railway from 2005 to 2011. In order to see the infrastructure vertical separation result we have chosen possible infrastructure charging price then forecasted necessarily variable until 2014 after that formulated LP model. The results of this study suggest that, infrastructure vertical separation can increase the Mongolian railway capacity with less government cost compared with direct investment to UBR. Beginning of study we considered suitable infrastructure charging price important for private investment. The results also suggest that obligation level from government is another technique to promote private company investment in Mongolian case.
author2 Alan J. Webb
author_facet Alan J. Webb
BatmyagmarMyagmar
馬映永
author BatmyagmarMyagmar
馬映永
spellingShingle BatmyagmarMyagmar
馬映永
An Alternative Pricing Framework for the Mongolian Rail Network
author_sort BatmyagmarMyagmar
title An Alternative Pricing Framework for the Mongolian Rail Network
title_short An Alternative Pricing Framework for the Mongolian Rail Network
title_full An Alternative Pricing Framework for the Mongolian Rail Network
title_fullStr An Alternative Pricing Framework for the Mongolian Rail Network
title_full_unstemmed An Alternative Pricing Framework for the Mongolian Rail Network
title_sort alternative pricing framework for the mongolian rail network
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/87725691370653538008
work_keys_str_mv AT batmyagmarmyagmar analternativepricingframeworkforthemongolianrailnetwork
AT mǎyìngyǒng analternativepricingframeworkforthemongolianrailnetwork
AT batmyagmarmyagmar alternativepricingframeworkforthemongolianrailnetwork
AT mǎyìngyǒng alternativepricingframeworkforthemongolianrailnetwork
_version_ 1718065906876153856