Using Simulation Method to Solve a Two-Echelon Repairable Inventory System Problem Subject to Service Constraints
碩士 === 國立成功大學 === 工業與資訊管理學系碩博士班 === 100 === In the field of production management,the study of multi-echelon inventory system has been a hot topic. We study a two-echelon repairable inventory system, which contains a central warehouse and multiple field depots that stock spare parts. When a failure...
Main Authors: | Fei-FangKuo, 郭斐芳 |
---|---|
Other Authors: | Shing-Chih Tsai |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/52213229047985218518 |
Similar Items
-
Using Retrospective Optimization to Solve a Two-Echelon Inventory Problem Subject to Service Level Constraints
by: Wei-TeLee, et al.
Published: (2017) -
Using OptQuest to Solve a Two-Echelon Inventory Problem Subject to Service Level Constraints
by: Margaret NathaniaSterling, et al.
Published: (2013) -
Using Sample Average Approximation and Feasibility Check to Solve a Two-Echelon Repairable Inventory System Problem Subject to Service Constraints
by: Ya-XinZheng, et al.
Published: (2012) -
Combining Cutting Plane Method and Local Search to Solve a Two-Echelon Repairable Inventory System Problem Subject to Service Level Constraints
by: Yu-ChiehTsai, et al.
Published: (2015) -
Using Sample Average Approximation to Solve a Two-Echelon Inventory System Problem Subject to Service Level Constraints
by: I-YingHo, et al.
Published: (2015)